Loading...
1993-01-07CONSERVATION COMMISSION BEVERLY, MASSACHUSETTS MINUTES OF JANUARY 7,1993 MEETING MEMBERS PRESENT: CHAIRMAN COTREAU, NANCY LODGE, BILL LISS, GLENN TERRY AND CLAYTON SMALL. THE MEETING WAS CALLED TO ORDER AT 7:45 P.M.. GLENN TERRY MOTIONED FOR THE PUBLIC HEARING SESSION AND NANCY LODGE SECONDED. ALL IN FAVOR. #5-430 FIRST CONTINUED HEARING SYMES ASSOCIATES LOTS A-B-C. GROVER STREET. PETER OGREN, PRESIDENT OF HAYES ENGINEERING IN WAKEFIELD, EXPLAINED THE PROJECT AND THE FOLLOWING: THE AREA IS ALL FLAGGED AND ADDITIONAL FLAGGING HAS BEEN DONE SINCE THE SITE VISIT ON DECEMBER 13, 1992. APPLICANT IS TO GRANT AN EASEMENT TO WIDEN THE DRIVEWAY. RE: THE SIDEWALK, THERE IS AN AGREEMENT TO ENTER A STUDY FROM PLANTERS ROAD/THAXTON ONTO ESSEX STREET. CLAYTON SHALL QUESTIONED THE 10 AND THE 100-YEAR STORM ELEVATIONS. PETER OGREN - THERE IS NO SPECIFIC ANALYSIS AND THIS IS A ZONE B. THERE IS NO ISSUE IN A BORDERING LAND SUBJECT TO FLOODING. THE WATER LEVEL NEVER CHANGES. BILL LISS MOTIONED TO CLOSE THE HEARING BEING THAT THE INFORMATION IS SUFFICIENT AND GLENN TERR~ SECONDED THE MOTION. ALL IN FAVOR. #5-431 SECOND CONTINUED HEARING SIq4ES ASSOCIATES .,MAPLEWOOD VILLAGE. PETER OGREN, PRESIDENT OF HAYES ENGINEERING IN WAKEFIELD, EXPLAINED THE PROJECT AND THE FOLLOWING: ADJUSTMENTS WERE MADE TO ALL THE WETLAND BOUNDARIES AND ADDITIONAL FLAGGING HAS BEEN DONE THROUGHOUT THE SUBDIVISION. THERE IS A PROPOSED EASEMENT FOR DRAINAGE PURPOSES. CHAIRMAN COTREAU - RE: THE REPLICATION AREA AND LOWER GRADES? WHAT LEVEL COULD IT BE TAKEN DOWN TO? PETER OGREN - IT IS 70.3' NOW, THE WHOLE AREA IS BETWEEN 68' AND 69' THE WHOLE FLOOR OF THE REPLICATION AREA. WE COULD CREATE A DITCH, CREATING A NEW STREAM CHANNEL. 68' ON THE EDGE, THEN 68' AND 69' CLAYTON SHALL QUESTIONED THE 10 AND THE 100 YEAR STORM. PETER OGREN - THE MAXIMUM INCREASE IN WATER DEPTH IS 4'. CHAIRMAN WANTS IT TO BE PUT ON THE PLAN. CLAYTON SMALL - RE: THE CROSSING, HOW MUCH OF A FINANCIAL INCREASE WOULD IT BE? ALSO IT WOULD BE TO KEEP THE STREAM NON-CULVERTED AND THE BANK ON TOP. PETER OGREN - THE COST OF A BRIDGE CROSSING WOULD BE APPROXIMATELY $30,000-A STRUCTURAL STEEL SPAN. THE CHAIRMAN - ALSO IN THE 2 CROSSINGS, TO SHOW THE WETLAND INCREASE. PETER OGREN - EXPLAINED THE STRUCTURAL 20~ SPAN WITH THE HEADWALLS. IT WOULD BE R0' WIDE AND 8' HIGH. THE AMOUNT OF LAND LEFT WOULD BE SUFFICIENT FOR ANIMALS TO PASS. (NANCY LODGE'S CONCERN). BILL LISS SUGGESTED TO SUBMIT THE IDEA TO COMMISSIONER ZAMBOURAS. CLAYTON SMALL FEELS IT IS COSTLY/NEGLIGIBLE. NANC~ LODGE LIKES THE IDEA. GLENN TERRY WANTS COMMISSIONER ZAMBOURAS TO VIEW THIS IDEA. THE CHAIRMAN WANTS THE FLOOD PLAIN AND THE ELEVATIONS ON 'THE HAP. BILL LISS AND GLENN TERRY ARE NOT IN PREFERENCE OF THE BRIDGE. PETER OGREN ASKED TO CLOSE HEARING BASED ON THE OPINION OF THE BRIDGE TO BE DECIDED BY THE DPW COMMISSIONER. BILL LISS MOTIONED TO CLOSE THE HEARING AND GLENN TERRY SECONDED. CLAYTON SMALL, NANCY LODGE AND CHAIRMAN COTREAU, IN OPPOSITION. HEARING CONTINUED-JANUARY 28TH. #5-433 550 CABOT STREET PARKING LOT VACEK TALACKO, ENGINEER FROM HANCOCK SURVEY IN DANVERS REPRESENTING THE APPLICANT. THE WETLANDS ARE STAKED AS WAS IN 1987. NEW FLAGGING HAS BEEN DONE. GLENN TERRY FEELS THE APPLICANT SHOULD HAVE ADDRESSED ALL THESE ISSUED. THEREFORE, THIS HEARING IS CONTINUED UNTIL JANUARY 28TH. NEW PUBLIC HEARING FOR LEN BERTEAUX OF 171 COMMON LANE FOR LOT #7 FOR A SINGLE DWELLING. THE SITE WAS FLAGGED IN LATE NOVEMBER'. THE CHAIRMAN VIEWED THE SITE AND WANTS THE ORIGIN OF THE FLAGGING, HE DOES NOT UNDERSTAND IT. THE WETLANDS GO BEYOND TEN FEET. THE STREAM GOES HIGHER. THAT IS TO BE FLAGGED AND TO BE CONTINUED UNTIL OFF, THE PROPERTY. THE ENTIRE WETLANDS ON THE SITE ARE TO BE FLAGGED. CLAYTON SMALL WANTS THE OTHER SIDE TO BE FLAGGED IN ORDER TO DEFINE THE WETLANDS. THE CHAIRMAN WANTS NEW CONTOUR LINES, DIFFICULT TO READ, THE OLD ONES AND THE NEW ARE TO BE LABELED. BILL LISS Questioned THE RECTANGLE OUTLINE. BERTEAUX - IT IS THE PROPERTY VEGETABLE GARDEN PLOT. THE CHAIRMAN QUESTIONED THE ROAD - GRAVEL? BERTEAUX - YES. BILL LISS - QUESTIONED BLASTING. BERTEAUX - YES, THERE WILL BE BLASTING. THE CHAIRMAN - THERE IS NO PONDING THERE, IT IS MAINLY A STREAM. RE: THE GRAVEL ROAD, IT WILL BE PUT IN THE 'ORDER OF CONDITIONS. IF THE DRIVEWAY IS TO BE PAVED IN THE FUTURE, THE APPLICANT IS TO RE-FILE. BERTEAUX IS PLANNING TO BUILD A RETAINING WALL OF STONE, AS TO DEFINE A YARD AREA. THE CHAIRMAN WANTS SOME EXPLANATION RE: THE WALL. BERTEAUX - IT WILL BE OF GEOTECHNICAL MATERIAL WHERE ONLY WATER PASSES THROUGH IT, NO OTHER MATERIALS/SILTATION. THE CHAIRMAN, FOR ADDED PROTECTION, WANTS DOUBLE HAY BALES AND A SILT FENCE. CLAYTON SMALL WANTS THE GARDEN LABELED ON THE PLAN. THIS HEARING IS CONTINUED UNTIL JANUARY 28TH. RECONVENE. REQUEST FOR A DETERMINATION OF APPLICABILITY - ~ FIRST CITY DEVELOPMENT CORPORATION - AMHERST ROAD LOT 74. REPRESENTING, CURTIS YOUNG. THE SITE DRAINS SOUTH AND A LITTLE TO THE WEST. THERE IS AN EASEMENT ONTO OBERLIN ROAD. CLAYTON SMALL WANTS A SITE VISIT. THE CHAIRMAN VIEWED THE SITE TWICE. 'WANTS A TOPO, AND A DECISION ON THE FLAGGING, SAW ANOTHER WET AREA, ALSO AN INTERMITTENT STREAM AND PROOF OF A KETTLE HOLE OR NOT OFF CORNELL ROAD WHICH IS A VERY WET AREA. RE: THE CULVERT - BROKEN? CLAYTON SMALL - SAW A SIGNIFICANT BRUSH PILE THAT WAS CUT DOWN, THAT IS TO BE REMOVED AND TO REMOVE THE ALREADY CUT TREES, AND TO TO KEEP AWAY ALL CUT BRUSH FROM THE RESOURCE AREA. SITE VISIT - SUNDAY, JANUARY 1?TH - 10:00 A.M. CERTIFICATES OF COMPLIANCE: #5-184 22 LANDERS DRIVE LOT 16 BEAVER POND PARTIAL. BILL LISS MOTIONED TO GRANT IT, GLENN TERRY SECONDED IT. ALL IN FAVOR. #5-204 OLD TOWN ROAD LOT 25 OAK HEIGHTS PARTIAL. BILL LISS MOTIONED TO GRANT IT, CLAYTON SMALL SECONDED IT. ALL IN FAVOR. #5-399 GROVER STREET LOT 10 PARTIAL. THE CHAIRMAN VIEWED IT AND IT IS NOT READY. IT WILL BE RE-VIEWED AGAIN, SUNDAY MORNING, JANUARY 10. UPON IT BEING SATISFACTORY, BILL LISS MOTIONED IN FAVOR AND GLENN TERRY SECONDED IT. NOTHING IS TO BE BEYOND THE HAY BALES. ALL IN FAVOR. #5-204 2 SHERWOOD LANE LOT 38 OAK HEIGHTS PARTIAL. REMOVE THE HAY BALES AND THE SILT BARRIER. CLAYTON SMALL MOTIONED TO GRANT IT AND GLENN TERRY SECONDED. ALL IN FAVOR.' #5-390 TED LEIGH EAGLE LANE. CHAIP/~AN-NEITHER BANK WAS STABILIZED, EROSION PROBLEMS ON BOTH SIDES. RE: THE 1 TO I SLOPE, IT APPEARS TO BE A 2 TO 1 SLOPE. RE: FOUNDATION MORTAR AND BRICK, 4* DEEP AND 4* BELOW GRADE ON THE INLET SIDE. THERE IS NO FLARE END ON THE OUTLET SIDE, ALSO.SHOULD BE AN ENERGY DISSIPATOR. ALSO, TO PUT A STONE SWALE INSIDE AND AT THE BOTTOM. THERE IS NO STONE ON TOP AND IT IS ERODING. THE WETLAND IS NOT STABLE. THE PIPE IS GOING .IN THE WRONG DIRECTION-COULD BE SEALED/PUT IN A LINER. IF EVERYTHING IS READY, THIS WILL BE CONTINUED-JAN. 28TH. 85-184 HYLAND LOT 49 BEAVER POND. GLENN TERRY MOTIONED THAT THE CHANGE IS INSIGNIFICANT, BILL LISS SECONDED IT. THIS IS CONTINUED-JAN. 28TH. ALL IN FAVOR. COMMUNICATION RE: CLEAN H~RBORS DUPLICATING OUR AERIAL PHOTOGRAPHS. BILL LISS MOTIONED THAT IT BE SENT TO THE CITY SOLICITOR AND NANCY LODGE SECONDED IT. TABLED UNTIL SUCH A~PROVAL. ALL IN FAVOR. ADJOURNMENT - 10:15 P.M. - BILL LISS MOTIONED TO ADJOURN AND CLAYTON SMALL SECONDED THE MOTION. ALL IN FAVOR. HAI~IE S. COTREAU/CLERK