Loading...
1991-01-17CONSERVATION COMMISSION BEVERLY, MASSACHUSETTS MINUTES OF MEETING JANUARY 17, 1991 Meeting called to order at 7:50 r.M.. Members present: Chairman Peter Gilmore, Vice Chairman George Batchelder, Glenn Terry and Bill Liss. Motion to recess for Public Hearings made by Glenn Terry and seconded by Bill Liss. All In Favor. Continued-#5-367. THE BEVERLY Tozer Road,Lot #55. Representing: Kevin De!oye from Vanasse Hangen Brust!in Company. DPW Commissioner, George Zambouras and Kevin Deloye went on a site walk. A. letter from the DPW Commissioner to the Commission submitted for tonight's meeting defining the two changes requested. At this time there were no further comments from the general pu~.lic. Hearing none. Hearing closed. Continued-#5-368. KELLEHER 13 Brlmbal Avenue. House constructzon in a buffer zone. Kel!ene~'s Pond. Representing from Hayes Engineering was Carl Balsley, from Wakefield, MA, also, Attorney Nancy E. O'Connel!. Photos were displayed at this time of the area flooding. A future potential of an added garage displayed on the plan. A dirt path around the pond, when pond rises, path is filled. Ground elevation = 64.5 inches, of the white house, noted on the plan. Grading down 3 To 1 slope, elevation 65" Driveway 12' in length. 50 cubic yards cf fill to be brought on for site landscapin~ near the garage. A culvert near the garage put in for water flow out onto Brimbal Avenue. This is a buffer zone project, with no alteration to the wetlands. All staking requested by the Commission has been done. George Batchelder commented're: bedrock. Balsley-Went i' below, struck no bedrock nor water. Cellar is designed into the house 3' below ground level. Driveway, curb and berm added, pavin9 is being considered. -2- GENERAL PUBLIC Gerry Overberg-174 Colon Street-Concerned with water flowing over Brimbal Avenue. Carl Balsle¥-A catch basin should contain it on Brimbal Avenue. DPW Commissioner-Commented that flooding should not be a problem. In a rainstorm of 6", there is some flooding. George Batchelder suggested to leave the hearing open in order that all the Commission members might view it, since the scheduled site visit for January 12th was snowed out. Other than that, information is sufficient. Plans to close the hearing, next Thursday's meeting, January 24, 1991. When the Orders of Conditions are issued, a copy is to be sent to the Walter .Residence. RECONVENE. Request for a Determination of Applicability for Kelleher's Pond. Applicant: John C. Kelleher, Jr. To perform work around the pond. To repair erosion to the southwest corner bank of the pond. Mr. Kelleher elaborated on the pond's history. Its uses for activities in the winter, such as ice skating; and in the summer for fishing. Maintenance must be done to avoid problems in the pipes and in the pond. NOTE on site visit, the bank erosion. Plans to use a stone and gravel mixture to hold the bank (for sturdiness). Growth and turf to follow. George Batchelder questioned type of equipment to be used? Also, vegetation/yardage? Kelleher: Approximately, 40 yards of material will be brought in from the far side (gravel), will go 2 to 5' into the pond. To be pushed in with a shovel. Saturday morning, anytime, Mr. Kelleher will be on the site for any Commissioners viewing it. Certificate of Compliance #5-304. 23-1/2 New Balch Street. TABLEd for January 24th, when there is less snow to inspect. Orders of Conditions-BRIDAL PATH LANE, Dan Finn, Trustee. #5-366. George Batchelder: Flow, sediment down the hill? To include in the orders, no clearing on the south, southeast side. Standards. All of A, B, C, D & H. No removal of standing trees or shrubs on the south, southeast side of the stream. ALL IN FAVOR. -3- Orders of Conditions for THE BEVERLY #5-367. Plan dated January 10, 1991 (revised). All but E< F & G. Standards-any debris and or silt that breaks through the siltation barrier and into the wetlands will be cleaned up within 5 working days and the Conservation Commission is to be notified, in writing, All In Favor. Discussion: Beverly Airport #5-279. Plan viewed upon and discussed by George Batchelder. Airport Commission is responsible to watch over this (tree clearing) after the first year. George Batche~der to write to DEP. No re-grading, also a snow fence is needed on the northside. Also, grubbing, siltation barrier below "A" in the wetlands, Chairman to submit letter to DEP. Kennel Hill Drive, Lot 76A. TABLED for January 24th. #5-362 SEAWALL 10-12 Congress Street. TABLED for January 24th. BUDGET DISCUSSION Eric Rizzo and Eric S.Hyler-Student Interns. Motioned by George Batchelder and seconded by Glenn Terry to accept both to work for the Conservation Commission and to be budgeted for it. Eric Rizzo/Eric Hyler to assist. All In Favor. Bill Liss motioned to adjourn at 9:25 P.M., seconded by Glenn Terry. ~LL IN FAVOR. MARIE S. COTREAU/CLERK