Loading...
1991-03-14CON6E RVATION COMMI881ON BEVERLY, MASBACHUSE'rT": MARCH 14, 1991 MINUTES MEMBERS PRESENT: CHAIRMAN PETER GILMORE, VICE CHAIRMAN GEORGE BATCHELDER, GLENN TERRY, NANCY LODGE, JOSEPH MANZI, BILL LISS AND VINNIE COTREAU. MEETING CALLED TO ORDER AT 7:45 P.M.. MOTION TO RECESS FOR PUBLIC HEARING SESSION MADE BY GLENN TERRY, IT WAS SECONDED BY BILL LISS. ALL IN FAVOR. FIRST PUBLIC HEARING-DEAN J. DARR LEVEL THE BACKYARD. 61 HATHAWAY AVE., LOT 6, TO APPLICANT PRESENT AND CONTRACTOR'DENNIS L'ITALIEN. WOULD LIKE TO RAISE TO THE LEVEL OF LOT 5, TO ADD 2 LEVEL TIERS TO THE BACK YARD. VINNIE COTREAU QUESTIONED THE CLOSENESS TO THE WETLAND. DARR DOES NOT INTEND TO FILL TO THE FULL EXTEND OF THE PROPERTY. GEORGE BATCHELDER-AFTER THE SILT BARRIER IS FILLED, WHAT WILL HAPPEN TO THE LOOSE MATERIAL. DARR-WILL LOAM AND SEED AND WILL TAPER OFF TO ALL ADJOINING LOTS, PAUL FIORE WILL BE DOING THE WORK. CHAIRMAN GILMORE QUESTIONED-HOW WILL YOU-DARE-KNOW THAT ALL WORK IS DONE CORRECTLY. DARR-I WILL HAVE A SURVEYOR GO OVER IT. JOE MANZI QUESTIONED A RETAINING WALL IN THE MIDDLE. DARE-YES, BETWEEN THE 2 TIERS. VINNIE COTREAU MOTIONED THAT THE INFORMATION IS SUFFICIENT TO CLOSE THE HEARING AND BILL LISS SECONDED IT. ALL IN FAVOR. CHAIRMAN GILMORE STATED THAT A STAMPED PLAN WILL BE NECESSARY TO OBTAIN A CERTIFICATE OF COMPLIANCE. #5-371 SOUTH ESSEX SEWERAGE DISTRICT FORCE MAIN IN THE RYALSIDE AREA.' REPRESENTING SESD, RAYMOND BOUCMARD, SESD, PROJECT COORDINATOR. METCALF AND EDDY, ARTHUR KNIGHT, RAY MAZAK,-KEVIN MC MANUS. BILL LISS IS EXEMPT DUE TO A CONFLICT OF INTEREST, BUT WILL REMAIN IN THE ROOM. -2- AREA L-OFF BAILEY AVENUE, IN DANVERS RIVER, TO'HARCH/PARKVIEW AVENUES AREA 2-ACROSS KERNWOOD AVENUE BRIDGE ESTUARY, IN DANVERS RIVER. AREA 3-OFF HOBART AVENUE, ACROSS BASS RIVER, TO SHORELINE CONNECTION NEAR WARD II PLAYGROUND. THE PROJECT INVOLVES CONSTRUCTION OF TWO SEGMENTS OF 30~ FORCE MAIN TOTALING APPROXIMATELY 2765 LINEAR FEET THROUGH 1) INTERTIDAL AND SUBTIDAL PORTIONS OF THE DANVERS RIVER (AREA 1) AND 2) INTERTIDAL PORTIONS OF THE KERNWOOD AVENUE BRIDGE ESTUARY (AREA2). iT ALSO INVOLVES CONSTRUCTION 1-30" AND 2-24" SIPHONS (1400 LINEAR FEET) ACROSS THE BASS RIVER FROM HOBART-AVENUE TO A CONNECTION ADJACENT TO THE WARD II PLAYGROUND (AREA 3). THESE ARE THE FINAL SEGMENTS TO BE COMPLETED FOR THE DANVERS/BEVERLY RELIEF INTERCEPTOR. PREVIOUS PORTIONS, WHERE REQUIRED, HAVE BEEN PERMITTED SEPARATELY. REVISED/ADDITIONAL PLANS WERE SUBMITTED AT THIS TIME. ARTHUR KNIGHT MADE THE PRESENTATION. THIS BEING'THE WATER PORTION OF THE PROJECT. THIS IS BASICALLY AN ENVIRONMENTAL PROJECT. AT THIS TIME SUBMITTALS RE: THE STATE REQUIREMENTS OF WATER POLLUTION CONTROL WERE DISTRIBUTED. AREA'l: HAY BALES, RIP RAP HAVE BEEN ADDED. ARTHUR KNIGHT EXPLAINED THE BARGING OPERATION AND HOW THE MATERIALS WOULD BE PLACED ON A SCOW WITH SIDING, SO AS NOT TO SPILL OVER. WILL USE PEASTONE AS A CUSHION FOR LAYING THE PIPE. THE HAY BALES AND SILT FENCES WILL BE USED TO PREVENT SEDIMENTATION. THE BUCKETS USED FOR DREDGING WILL HAVE HOODS ON THEM,SO AS TO PREVENT MATERIALS FROM SPILLING OUT. THE CONTRACTOR WILL WORK FROM OCTOBER 1§ TO FEBRUARY 15, SO AS NOT TO INTERFERE WITH RECREATION TIME. AREA 2-HAY BALES AND RIP RAP SLOPING HAS BEEN ADDED TO THE PLANS IN 3 DESIGNATED AREAS. SHOWN ON PLANS SUBMITTED THIS EVENING. MATERIALS USED UNDER THE PIPE, SCREENED GRAVEL, CLEAN SAND, ETC. SAME TIME SPAN, AS IN AREA 1, OCTOBER 15 - FEBRUARY 15, WORK TO BE DONE.' AN ANAEROBICAREAWHERE CONCRETE SHEETING IS DONE WELL BELOW THE SURFACE. AREA 3- STARTS AT THE END OF HOBART AVENUE ACROSS THE BASS RIVER AND CONNECTING ONTO GOAT HILL. TEMPORARy STEEL SHEETING WILL BE USED IN THIS AREA AND LEFT IN PLACE ONE FOOT ABOVE THE TOP OF THE .30 INCH PIPE. WILL WORK SO THAT HALF OF THE RIVER WILL REMAIN OPEN FOR BOATING PURPOSES. GEORGE BATCHELDER RE: TRENCH COVERING. BOTANIST, JAMiE MARN, METCALF AND EDDY, COMMENTED ON THE SALT HARSH, MUST KEEP IT MOIST AND SOFT, TO STORE FOR WEEKS ONLY, IN A RESOURCE AREA. TO WORK QUICKLY IN THE SALT HARSH AREA. THE PROGRESS RE: THE START, ETC. SHOULD BE STATED IN THE ORDER OF CONDITIONS, SUGGESTED BY RAY BOUCMARD. -3- INFORMATION SUFFICIENT, VINNIE COTREAU HOTIONED TO CLOSE THE HEARING AND GEORGE BATCHELDER SECONDED IT. ALL IN FAVOR. CHAIRMAN GILMORE STATED TO THE APPLICANT, TO SUBMIT A "PROPOSED" ORDER OF CONDITIONS BEFORE OUR NEXT MEETING IN TWO WEEKS. PEI~4IT EXTENSION 'FOR #5-306, JOHNNY APPLESEEDS, INC. HILL ST. (3 YEARS). VINNIE COTREAU MOTIONED TO GRANT IT AND GLENN TERRY SECONDED IT. ALL IN FAVOR. #5-140, GEORGE ZANBOURAS, 17 NOBLE HILL ROAD, (1 YR.). GEORGE BATCHELDER MOTIONED IN FAVOR OF IT AND NANCY LODGE SECONDED IT. ALL IN FAVOR. #5-217, LOT 31, MEADOW ROAD, WILLOW POND (1 YEAR). JOE HANZI MOTIONED IN FAVOR OF IT, AND BILL LISS SECONDED IT. IN FAVOR. ALL DISCUSSIONS: WALTER MC GLYNN MEMORIAL. TO PLACE A PLAQUE ON THE SIDE OF THE SHELL AND ALSO TO PUT TWO BENCHES THERE, WITH TREES AND A FLOWERING TULIP BUSH. VINNIE COTREAU TO CONTACT JOAN FAIRBANK AND SECURE THE SITUATION. PHILLIPS NATURE PRESERVE. THE CHILDREN OF PHILLIPS WOULD LIKE TO ERECT ANOTHER DISPLAY OF JOHN PHILLIPS, A SITE PLAN OF THE GARDEN. PETER GILMORE TO CONTACT THE CHILDREN TO O.K. IT. sTANDLEY STREET GREENHOUSE-LETTER FROM W.J. FARLEY. ROBIN LEVESQUE INSPECTED THE AREA, SAW TREE BURNING AND THEN JUST LEFT IN THE DRIVEWAY. ALSO, A TRUCK AND A UTILITY TRAILER ARE PARKED THERE. NEXT WEEK, GEORGE BATCHELDER AND ROBIN LEVESQUE TO CHECK IT OUT. GLENN TERRY MOTIONED TO ADJOURN AT 9:33 P.M. AND BILL LISS SECONDED IT. ALL IN FAVOR. NEXT MEETING, MARCH 28, 1991. HARIE S. COTREAU/CLERK