Loading...
2003-06-05 City of Beverly, Massachusetts Public Meeting Minutes Board: Parks and Recreation Commission Subcommittee: Date: June 5, 2003 Place: Beverly Public Library Board members present: Mark Casey, Kevin Hobin, Arthur Powell , Patti Adams, Dave Gardner, Gary Lambert, Jack O’Neil Board members absent: Lauren Young Others present Bruce Doig, Tom Scully, Bill Collins Minutes of previous meeting were accepted as written. Park Department: A large pine tree, recently donated to the city, was installed at Lynch Park up near the office and tot lot. DIRECTOR’S REPORT: Playground Equipment Update: Holcroft, Gillis and Cahill installations are complete. Swings at Obear and Lynch need to be installed. ADA Compliance: Many parks have been visited, most of which need cut outs through the equipment timbers for handicap accessibility, as well as more HP parking spaces at all parks. Mr. Daignault is putting together a plan for the city, which will include the needs for the parks. Touch A Truck was a huge success. DPW handed out over 2000 hardhats. Parks: Will open Tuesday, June 24 and the beaches on June 23. Budget: Hearing with City Council at City Hall on June 17, Plan A budget has been submitted ($248,000) and a Plan B budget has been requested ($231,000). Veteran’s Memorial at Odell Park: Ruling returned by the City Solicitor “the Commission is still fully responsible for the park” Sandy Point Sailing Association: Sailing equipment will remain with the Recreation Dept. since it cannot legally be donated and leasing or renting would come under strict state regulations. Meeting was held with Mr. Lupini, Bruce, Dave Gardner, and Mark Casey to discuss the new building plans for Beverly High School to make it a community facility year round. Mr. Lupini also mentioned that he should be contacted directly if we have any difficulty obtaining school building permits for our programs. Bartlett: Mr. Lord, a park neighbor, was present to discuss the field and light problems at Bartlett Gardens. Since the basketball lights are on all night, he has had to call the police many times to report use of the park after 10 pm. He would like to see the lights on a timer. He would also like to see the lights hooded to cut down on towards his house. The possible increase in vandalism was discussed. Bruce agreed to speak to Mike Collins to see what the options would be. Bench Plan: Discussed the need for a plan for Lynch and Gillis. It was decided to look over the sites on the park tour, which is scheduled for June 14 at 7 am. Beverly Golf & Tennis Pool: Pool opening was delayed because of a faulty pump, which has been replaced. Discussed other improvements needed such as repairing the bottom drain, which was closed off last year because of a leak. For safety purposes, all pools should have two drains. The costs of repairs to the pool were estimated at $25,000. ADA compliance needs were also discussed. These would include a lift for the pool and a complete overhaul of the bathhouse facility. These improvements were estimated at an additional $25,000. Memberships are low. Should improve as the weather does. Minutes 6/5/03 Page 2 Beverly Golf & Tennis Pool: (continued) The use of personal floatation devices (PFD’s) were discussed. They were allowed last year and we have received many calls about our current policy to not allow any PFD’s. Bruce is recommending that only Coast Guard Approved PFD’s be allowed at the pool and the parent must be in the pool with the child. Motion was made, seconded and carried to only allow Coast Guard Approved PFD’s for the children who need them. Parent must accompany child in the pool. Dogs: Ordinance passed by the City Council excluded the word beaches. Discussed the possibility that beaches that are not owed by the City (Rice’s, Brackenbury) would not be covered by the ordinance. Clarification is needed. OPEN SPACE ACTION PLAN: Draft of the plan was presented by Dave Gardner. A motion was made to accept the Sally Milligan Kiosk Plan, motion was seconded and carried with all in favor. A motion was made to accept the overall draft plan, motion was seconded and carried with all in favor. BARC REPORT: Signs at the parks (except for Lynch) still need to be updated to reflect 7:30PM instead of 9:00PM. The numbers have been ordered but some are backordered. Signs will be updated when the new numbers arrive. Lynch Park Advisory Plan was reviewed. Meeting adjourned. Respectfully submitted, Gail Carmody Recreation Department