Loading...
2006/06/13 BEVERLY GOLF & TENNIS CHAD CRANDELL ABSENT DOUG RICHARDSON 30 MINUTES LATE JEFF KLEIN JOE ECKSTROM, DIREDTOR OF OPERATIONS FOR JOHNSON GOLF GARY LAMBERT KEVIN ASCOLILLO-ABSENT ML CALLED TO ORDER AT 7 PM ONE SUGGESTION HIRE AN ENGINEER FOR DRAINAGE IN CONJUNCTION WITH THE ARCHITECTS. ML ? JE WHAT WILL BE DONE ABOUT TREES, DRAINAGE DITCHES, WILLOWS. MINUTES: MINUTES SAY MARCH? JK DB 4-0 APPROVED MINUTES MNGE CONTRACT NONE HIST BLDG STATUS DB SPOKE TO JOHN DUNN AND HE HAS PEOPLEL WORKING ON IT, TINA CASSIDY OF PLANNING, RAY BOUCHARD GOING FORWARD WITH LIFE SAFETY ISSUES, REEDIT GALE REPORT REFINED WITH LIFE SAFETY ISSUES. THEY ARE ALL SAFETY ISSUES THE COUNCIL WILL HAVE TO TAKE INTO CONSIDERATION. GL SHORT FIXES TO ALL OF THESE THINGS LESS THAN 1 MIL. JK ? FROM BEGINNING TO REMOVE FROM HISTORICAL SHEET, HOW LONG? DB A COUPLE YEARS JK ISSUES THAT CANT WAIT TWO YEARS DB RAY BOUCHARD WILL STUDY IT AND TAKE THE PACE. ML KEVIN ASC WILL TRY TO GET SOME GRANT MONEY ML REVIEWS ENTERPRISE FUNDS MAINT $2500 BALANCE 23.9 & 33 OUT OF OTHER FUNDS CAPITAL OUTLAY ACCOUNT, 22,500 FOR GALE ASSOC. 8000 FOR POOL, 7000 DOWN PAYMENT ON MASTER PLAN 12000 FOR TENNIS COURTS AND TREE SERVICE JD IS COMMITTED TO PROVIDING FUNDS ML BALANCES OF 45,000 TO PLAY WITH GL 12000 FOR ROTUNDI FOR TENNIS COURTS, MAYBE WE SHOULD ASPHALT. JOE SAYS WHEN MERCIER NEEDS HELP, WE TRY TO PROVIDE. ML ANY ? ON THE FINANCE REPORT? USGA REPORT DB REPORT FIRST, ML DRAINAGE IS THE BIGGIST THING. DB LOOKING FOR ENG TO WORK WITH ARCHI JE THE USGA PLAN DOES RECOMMEND AN ENGINEER JE THEYRE FROM NORWELL, THEY’VE DONE DRAINAGE. THEY’VE WORKED WITH CONCOM, DB WRITE TO THE THREE SUGGESTIONS, WOULD THEY PROVIDE US INFO ON YOUR FIRM. THEY NEED AN ENGINEER TO CONTINUE. DB APP ME TO CONTACT THESE AGENCIES TO REVIEW OUR SITUATION FOR OUR CHOICE. JE TALKING WITH BRIAN AND JIM, WE NEED TO START FROM SCRATCH. ML WATER DRAINING FROM FOLEY HILL JE ONCE MAIN CRAINAGE IS IN PLACE, YOU ;CAN ADD TO IT, YOU NEED INFRASTRUCTURE TO CARRY WATER OFF GOLF COURSE. DB WILL HAVE TWO OR THREE BEFORE WE MEET AGAIN, SET A DATE AND STAGE THEM EVERY FEW HOURS. ML GET ENGINEER WITH DRAINAGE PLAN, TO WORK WITH BRIAN ARCHTECT, JE HE’LL TURN DRAINAGE OVER TO ENGINEER JE CLEANING TRENCHES IS ONGOING, AND WILL CONTINUE TO BE DONE AS WE GO DB E NEED SOMEONE WHO CAN WORK WITH CONCOM,ESPECIALLY NEW DRAINAGE DB MIKE COLLINS DPW KNOWS A DRAINAGE PERSON, ENGINEER, GL SPEAKS OF DARTMOUTH FLOODING RECENTLY, CITY NEW ABOUT THAT YEARS AGO,MAYBE GOLF COURSE CAN BE TIED INTO THE CITY PROJECT JE WILL ENGINEER WRITE SPECS FOR CONTRACTOR, DB HAVE MASTER PLAN DONE BY OCTOBER FIRST JE TO HAVE MASTER PLAN COMPLETE YOU DON’T HAVE TO HAVE THE DRAIN ENGINEER DONE GL WE NEED TO KNOW COST, WE NEED ESTIMATE, ENGINEER GIVE YOU ROUGHT ESTIMATE, GO OUT TO BID, SOIL COMPACTION ON GREENS AIRATING, JE HE RECOMMENDED TO GO TO LARGER TINE, LOHNGNER TO HEAL, THATCH REDUCTION, SOME GREENS WONT TAKE THE TINES, ROOTS ARENT AS GOOD AS THEY COULD BE, THE SUGGEST SMALLER TINES TO JUST JPOKE THROUGH SURFACE. WE WLL TRY TO DO IT IN THE FALL. USE NEEDLE TINES TOP DRESSING OF SURFACES WE WERE AGGRESSIVE, ITS IMPORTANT, WE COULD HAVE MORE BUT THE WEATHER HAS TO BE DRY, SHOOTING FOR MONDAY OR TUESDAY. DO IT WHEN STREES IS OFF GRASS. JE WE DO EVERYTHING THAT IS MENTIONED IN REPORT, CHEMICAL APPLIED, NITROGEN, FERTILIZER, CUTTING HEIGHTS, GENERAL STREE ON GREENS, WHEN IT FLAIRS, USE CHEMICALS TO CONTROL TREES CHUCK IS WORKING ON IT, ML POST TREES COMMENTS, WEIRD TREES ON 9, I JE PHIL K RELUCTANT ON REMOVING SOME OF THEM. DB JE AND PHIL HAVE A RULE REGARDING WHICH TREE TO TRIM OR REMOVE JE IF WE CAN DO IT WE DO IT, IF I THINK THE TREE NEEDS TO BE REVIEWED I WILL TALK TO PHIL JE CLEARING AROUND FIRST GREEN WAS DONE WELL, WE DID IT SOME MORE, UNDERGROWTH ML TRY TO ELIMINATE WILLOWS, TALK TO PHIL, WHAT IS THE LONG RANGE PALN JE IF WE HAVE 12000 TO SPEND, I’LL CALL PHIL AND CONSULT. I’LL FORMULATE A LIST FIRST DB MAKE LIST WITH JE AND PHIL THEN DISCUSS BUDGET GL 17 & 11 TREE WORK, DO OVER TIME JE PHIL CAN LOOK AT IT DIFFERENTLY, BUT WE WORK WELL TOGETHER COMMON GROUND GL TOO MANY TREES AROUND GREENS CAUSING PROBLEMS IN WINTER AND SUMMER, 15 AND 17, 15 IS COSMETIC, 17 IS WILLOWS, 11 PINES JIM SKOROLSKY WANTS THE PINES GONE, THEY PROTECT THE CLUB HOUSE ML CAN WE TOP THEM JE SOMETHING SHORTER GROWING MORE ATTRACTIVE DOWN THE LIST ML MAKE LIST ML RENOVATIONS OF TEE BOXES, LEVELING SOME TEES AND ADDING SOME, TREES ON 7,8,9, JE 7,8,9 ARE AFFECTING THE GREENS ML PLYWOOD COVERING SOME DITCHES, CHECK ON THEM ML MAINTENANCE SHED, ITS DISGUSTING, WE SHOULD MOVE IT IN THE MASTER PLAN, BEHIND 1. CLEANING OF MACHINERY JK THE WHOLE AT 14, EYESORE, NO GRASS, ROCKY, PILES OF JUNK, OLD SOIL ASPHALT,IT’S BEEN LIKE THAT FOR YEARS. KEVIN A ARRIVES JE NOT WELL MAINTAINED, JK IN NEED OF REPAIR, ML PUT IN MASTER PLAN RELOCATION OF MASTER PLAN, JK THE PILES ON 14, ML RELOCATE BARN PART OF MASTER PLAN, EXTENDING CAR PATHS PART OF MASTER PLAN LABOR 11 EMPLOYEES THROUGH SEASON JE WE HAVE 12 NOW, 1 PART TIME MECHANIC, EVERYONE ELSE IS FULL TIME ML THE PEOPLE YOU DO HAVE ARE TRAINED JE WE WORKED HARD ON GETTING BARE SPOTS GREENED, IT GETS GOUGED, CHUCK NEEDS TO TELL HIS GUYS JK TOURNAMENT ON SUNDAY MORNING, JE RIGHT NOW WERE TRYING TO KEEP CAUGHT UP WITH MOWING WITH ALL THE RAIN. USGA MASTER PLAN DB JOE TAKE US THROUGH PLAN, NEXT MEETING WE’LL DISCUSS IT, AND BRIAN WILL TALK TO US, JE THIS IS THE PRELIMINARY, WE GIVE THEM FEEDBACK AND HE’LL COME BACK WITH SECOND PLAN, WE’LL MARK UP MY PLAN OFFICIAL PLAN DB GAVE TOM ONE OF THESE AND AIRIALS, TOM SMITH JE WHERE YOU SEE SHADED AREAS ARE IMPROVED DRAINAGE, WE COULD ADD A FEW AREAS ON TO THIS, WE CAN POINT THEM OUT TO ENGINEER, THEY NEED IMPROVEMENTS GL ON FIVE SHOULD BE SHADED, JOE E FIRST HOLD: REC IMPROVE DRAINAGE, FINISH OFF CART PATH, ITS DIRT TRAIL, RUGGED, IMPROVE LOOK OF BACK PART OF TEE, BACK PART HAS DRAINAGE ISSUES BUT OTHERS ARE WORSE, SU BDRAINAGE OFF MAIN DRAINAGE, CAN CREATE SLIT TRENCHES, INTERCEPTOR DRAIN BEDORE IT GETS TO GREEN, WEVE DONE TREE WORK, MAYBE EQUIPMENT \TO\ GET OUT STUMPS, GRUB OUT CLEAR AREA, SEED IT AND MAINTAIN, CONSIDER CHANGING GREEN, ND 2 HOLD: LEVEL TEES, CLEAR OUT BRUSH, PAVE ROAD, NEEDS DRAINAGE DOUG R ARRIVES MAYBE ADD TEE AND MOVE BRUSH BACK, THEY WILL PUT A DRAIN THROUGH LOW SPOTS THROUGHOUT COURSE,CART JPATH, DEVELOP CART PATH PLAN FOR ENTIRE COURSE, RD 3 HOLD THE TEE SHOULD BE BIGGER, OVERHANGING TREES, CART PATH, TH 13 ITS NOT UNUSUALLY TO HAVE ALL MAINTAINED, SOME OF THE HIGHER AREAS CAN BE CUT BACK, JIM SC SAID LET THE AREA GO, TH 4 TREE WORK, ROOT PRUNE, BIGGER PIPE SIZE FOR DRAINAGE, TH 5 DRAIN AT BOTTOM OF BUNKER, TEE IS A MESS, WATER BREAKS OUT OF HILLSIDE, DRAINAGE NEEDED, A DRAIN HAS FAILED, THE WATER GOES RIGHT INTO THE APPROACH, THIS TEE MAY BE THE FIRST TO BE DONE 6TH WILLOWS REMOVED, DRAINAGE, TREE ROOTS, BLOCKAGE MAYBE SOMEWHERE, DIG UP CART PATH TO FIX BLOCKAGE, TH 7 CART PATH, GET BRIANS ADVICE ON CART PATH, TH 8 SOGGY, MOVE FOOT BRIDGE FOR CART PATH CONVENIENCE, ? BRIAN TREES TH 9 JUNK ALONG TREE LINE, TREES ON BACKSIDE OF GREEN, LINDEN TREES AND CHERRYS, THEY SCREEN PARKING LOT, TRIMMING HEDGES, TH 10 CART PATH REVIEW, RESTORE TEE TO ORIGINAL SHAPE, DO AWAY WITH LOOP TH 11 ADD TEE, CLEAN UP WORK, REMOVE TREES, JIM IS USGA MAN WHO WROTE REPORT, RENOVATE BUNKERS, DRAIN IN POND NEEDS TO BE CLEANED OUT, TH 12 TH 13 50 YARDS OF PILES, WASTELAND, CLEAN UP, WHITE GRUBS, MOVE SHED, TREE LINE WORK, GARY LEAVES 8:35 JPM TH 15 NET, $27,000, HITTING HOUSES, PUTTING UP A NET IS ADDRESSING THE PROBLEM, TH 16 TREE WORK, SWAMP PROBLEM, PAVE THE CART PATH, INVITE BRIAN FOR 7/11 MEETING. TENNIS COURTS ARE UP AND RUNNING, MERCIER SAYS THEY ARE IN THE BEST SHAPE, JK MIKE NEW MACHINE, WHO PAYS, NO ONE KNOWS WHO DOES WHAT FOR TENNIS, HE NEEDS A ROLLER, ITS JOHNSONS RESPONSIILITY, HE ROLLER IS ON ITS LAST LEG, @2500 FROM ROTUNDI, HE SHOULD NOT COME TO COMMISSION FOR EQUIPEMNT, OCONNELL PLUMBING OVER THERE FOR HANDICAP BATHS, JK JOHNSON MNGT HAVE A FORMAL AGREEMENT JE YES, HE ALWAYS WANTS MERCIER SHOULD BE DEALING WITH JOHNSON MANAGEMENT AND THE CITY IF POSSIBLE, JE ITS NOT THE COMMISSIONS RESPONSIBILITY ML HE HAS TO BUY CLAY FOR COURTS, JE HE HAS TO MAINTAIN COURTS, I’LL TALK TO HIM, JK THE CONTRACT STATES MAINTENANCE FOR WHOLE FACILITY, MACHINERY SUPPLIES WHEN NEEDED, ML NOT THINKING OF TENNIS, ML ASK DOUG WHAT HIS INTERPRETATION OF THE TENNIS IS JE MIKE TALKS TO COMMISSION MEMBERS FOR MAINTENANCE, OUR PREFERENCE IS GOLF COURSE FFIRST. JK ESTALISH A CHAIN OF COMMUNICATION, IF EXISTING CONTRACT HE NEEDS TO ABIDE BY JOHNSON MNGT. JK HES DOING THE BEST JOB HE CAN JE MERCIER COMES TO US FOR NEEDS ML PLEASE LOOK INTO THAT, OLDL POOL AREA ML PUTTING GREEN? JE PUT ON MASTER PLAN, PUT FUNCTION TENT OUT FRONT ML GOOD FOR MASTER PLAN, BUT COME FORWARD WITH IT SEPARATE TO MOVE QUICKER JK ENTERPRISE ACCOUNT JK CAPITAL IMPROVEMENT, DB CIY SHOULD PAY FOR IT, JOHNSON CAN DO IT AT COST JE GOLF COURSE CONSTRUCTION COMPANY, GET ESTIMATE NEW BUSINESS ART DANEAULT, ADA, ASKED FOR GRANT MONEY FOR FACILITY, HE WILL LOOK INTO CEBG OFFICE, EVERY YEAR CITY DOES AN APPLICATION, ADA DOESN’T MEET CEBD GRANT, THE RISK INVOLVED, IF HE PUTS IT INTO HIS PLAN AND IT DOESN’T GET FUNDED, HE WILL RESEARCH IT FOR US, ART DANEAULT, HANDICAP SIGNS, JE THEY’RE NOT PROPERLY MARKED, ART D. STRIPING, DB JK 8:55 PM