1987-01-08
'(1[11c QItt~ of~2uerI~?- c:Cltu55udllt5ctts
CONSERVATION COMMISSION
BEVERLY, MASSACHUSETTS
~INUTES OF YjEETING ON JANUARY 8, 1987
MEMBERS PRESENT: Ray Bouchard, Bill Liss,
George Batchelder, Joe Manzi, and Paula Bartlett
Meeting called to order at 7:55 P.M.
Motion to recess for a Public Hearing made by Bill
George seconded
ALL IN FAVOR
Cont. ~ 5-230 City of Beverly, Brackenbury Lane and Pickman
Road.
George Zambouras made the presentation. additional
information submitted to members.
Rip-Rap along be~ch constantly gets moved around, due to
high tides, wave height etc.
George Batchelder questioned flap valve, also, any change in
the existing wetlands?
George Za8bouras: virtually there will be no change.
Joe Manzi questioned the seawall.
G. Zambouras: no major wok re: the seawall. All work will be
done behind it.
GENERAL PUBLIC
John Morse- Abutter- would like a cleaning out between his
property and the seawall. Also questioned the metal stairs,
George Zambouras assured him they won't be t.ouched.
Revision to be submitted
HEARING CLOSED
RECONVENE
#5-92-#5-130 Roderick Ave. Certificate of compliance
Present: Attorney Robert Cornetta, Ron Trentini,Builder;
Joe DiLorenzo,Chas Wear; Engineer Carter and Towers.
George Batchelder referred to October 25, 1986 letter.
Item #6 Alterations of houses behind wetlands.
George feels this is a major discrepency.
(2 )
Joe commented all grading was to be leveled (from former
meetings) at Beth and Joan's request.
Cornetta referred to the letter of June 18, 1985; much
deliberation re: plans.
Enforcement order, site survey, site visits,etc. 16E,15,
16B, 16A seeking finals.
Cornetta displayed plan from Sept. 1985- Lots 16 and 16E.
Alson seeking a cert on the roadway and the pipeline (goes
fr'om lot 16E). Information sufficient!
Field ~ 5-53. Permit extension request
Discussion questions completion of proJect?
Field: hopefully to be completed within the next year.
Bill: We would like to see some of these items cleared up!
Motion for a one year extension made by Bill
Joe seconded
ALL Pl FAVOR "
#5-11 Centerville Seweer Certificate of compliance
Motion to issue madere by Joe
Paula seconded
ALL IN FAVOR I'
~5-159 George Warren/ Greenwood Ave. Su@perceding
Certificate of Compliance
Motion to issue made by Paula
Joe seconded
ALL IN FAVOR "
~5-84 Rossi 29 Linden Ave
Motion to recind previous six month ext. and to issue a one
year extension made by Paula
Bill seconded
ALL IN FAVOR!!
#5-234 Hosman Lot #22 Longfellow Place
Bill commented on the blasting/material should be removed/
to be included in the Order of Conditions.
Motion by George
Bill seconded
ALL IN FAVOR !
Hay bales- Top of bank and siltation fence.
No silt in the wetlands
Blasting debris to be removed from site.
Standards to be included.
Varian #5-219 Cert of Compliance
Motion to issue (full) made by George
R i 11 Sf.>co~d.~~___
A[[ IN FAVOR !!
(3)
#5-92 Roderick Ave
Bill motioned a Certificate of Compliance for the pipeline
Joe seconded
ALL IN FAVOR "
#5-130 16A much deliberation by George Batchleder.
Motion for a full made by Joe
Bill seconded
George abstained Certificate of Compliance
ALL IN FAVOR "
~ 5-130 16B Certificate of Compliance Full
Motion made by Joe.
Bill seconded
George opposed
ALL I N fAVOR It (rr.aJor-i ty)
MOTION CARRIES
#5-130 16E (sets in back) Full Certificate of Compliance
Replacement area/revegetated. Compliance
Motion by Bill
Joe seconded
ALL IN FAVOR " Unanimous
An ongoing condition re: revegetation.
5-130 ~ 15 Last lot on left-hand side.
Motion for a full Certificate of Compliance made by Bill
Joe seconded
ALL IN FAVOR
Unanimous
Motion to adjourn at 10:00PM made by George
Bill seconded
ALL IN FAVOR "
Marie S. Cotreau/ Clerk
***********************************************~************