Loading...
1992-09-17 BEVERLY PUBLIC LIBRARY BUILDING COMMISSION Minutes September 17, 1992 PRESENT: John Coogan, Neil Olson. ABSENT: John Quinn. Also present: Thomas Scully, William Capone, Jeffrey Hoover. ARCHITECT'S REPORT: (1) TLT has forwarded a change order #47. Most of the this COR constitutes a claim from Abingdon Steel, the steel fabricators. Jeff Hoover will draft a response. (2) Jeff Hoover requesting a proposal from Environmental to investigate and prepare specifications removal of asbestos containing material from the roof of building. (3) Jeff Hoover is preparing some proposals for cost savings on the project. (4) In response to our request for credit for waiving permit and inspection fees, TLT responded that they had never included fees in their bid. (5) Tappe and Associates has received a report from the Chris Eaton, preservation expert, on repairs to the facade of the original building. Hunter for the the old MOTION: By Neil Olson, seconded by John Coogan to approve the following Change Order Requests: (1) #65 $1,477 to relocate the exterior door from the meeting room. (2) #78 $9,682 to relocate floor boxes. (3) #79 $5,357 for fireproofing stair no. 2 and 3. (4) #80 $186 to modify drain covers. (5) #84 $1,153 SO VOTED. MOTION: By Neil Olson, seconded by John Coogan to pay monthly invoices. SO VOTED.