Loading...
1996-04-08ELEMENTARY FACILITY BUILDING COMMISSION MINUTES A meeting of the Elementary Facilities Building Commission. was held on Monday, April 8, 1996 at 12:00 noon at the Briscoe Middle School. Present were Mike Lauranzano, Nancy Levin, Judy Mulligan, Rod Maxner, Tom Scully, Michele Gordon and Earl Flansburgh and Jeanne Kuespert of ERF+A. Jeanne Kuespert handed out an agenda and some material regarding three different options for food service (see attached). The cost proposals for each option were reviewed and discussed. Mike Lauranzano made a motion to accept option 1 (to increase the new school kitchen by 700 sq. ft.) Nancy Levin seconded and the motion passed 2-0. A schedule for Design Subcommittee meetings was handed out. The next building commission meeting will be held Monday, April 22, 1996 at 12:00 noon at Briscoe Middle School. Res ectfully submitted, Judith A. Mulligan Secretary/Clerk BEVERLY ELEMENTARY SCHOOLS ERF+A PROJECT NO: 9600.00- 9606.00 5 April 1996 FOOD SERVICE SCENARIOS Relative to Budget Decisions and Schematic Design Cost Estimate as of I April 1996 OPTION 1 Shipping hot food daily to satellites C;~;~ Satellite Receiving Kitchens at five schools Least expensive solution/Schematic DeMgn Option OPTION 2 ' · Central Kitchen at the New School Shipping frozen food I x per week to satellites Partial Preparation Kitchens at five schools Best quality solution/Preference of Food Service Director OPTION 3 Selr- Contained Kitehen at Six Sehools Best quality solution Subtotal cost: Additional GSF ~ $100/sf Subtotal cost: Additional Equipment $70,000 ($64,000) $225,000 $340,000 $185,000 $280,000 TOTAL ADDITIONAL COST S6,000 $565,000 $465,000 NOTE: I. It is assumed that these additional costs will be part of the present Total Project Budget and that other building costs will be modified during DD to account for the larger kitchen facilities. 2. lfdishwashing facilities are needed in addition to potwashing facilities (included)~ an additional cost of $88,000 will be necessary. * Schematic Design includes FS equipment cost allowances orS1.44 per GSF -- approximately $480,000 Crabtree MeGruth AtomelateS'. lno, & Coiburn & Guyotto Consulting Partnership April 3, 1996 POSSIBLE FOOOSERVICE SCENARIOS BEVERLY ELEMENTARY SCHOOLS CENTRAL KITCHEN AT NEW SCHOOL: Receiving bulk food, cooking and dally shipping of prepared hoVcold food to satellites plus serving in adjacent cafeteria: SATELLITES: Receiving prepared foods. minimum heating Or cook-off, and serving. Dishroom does not effect size but has cost implications. Cove (600 students) North Beverly (450 students) Ayers (600 students) Centervilla (450 students) Hannah (450 students) *Dishroom equipment: Add $130000 NET "Dishroom equipment: Add $18.000 NET 2.850 SF $250,000.' '1,100 SF $35,000." 1,000 SF $32,000.' 1,1OO SF $35,000." 1,000 SF $32,000.' 1,000 SF $32,000,' CENTRAL KITCHEN AT NEW SCHOOL:' Cooking and shipping minimal cold ingredients products to neighborhood schools plus serving tn~ adjacent cafeteria: . 2,000 SF $235,000.' SATELLITES (No longer considered 'satefiltes' due to amount of on-site preparation): Full preparation kitchen teceivlng some prepared foods, bake-off, substantial cooking, and serving. Dishroom does not effect size. Cove (600 students) North Beverly (450 students) Ayers (600 students) Center~ille (450 students) Hannah (450 studenls) 1,550 SF $120,000." 1,400 SF $115,000.° 1,550 SF $120.000." 1,400 SF $115,000.' 1,400 SF $115,000.' 'Dishroom equipment: "Dishroom equipment: Add $13,000 NET Add SIS.000 NET SELF CONTAINED KITCHENS AT SIX SCHOOLS: Full preparation kitchen performing all functions from raw product. Dishroom does not effect size. New (450 students) Cove (600 students) North Beverly (450 slude~ls) Ayers (600 studentS) Centervilla (450 students) Hannah (450 sludems) 1,450 SF $125,000.' 1,600 SF $130.000." 1.4S0 SF $125,000.° 1,600 SF $130,000.'" 1,450 SF $125,000.' 1,450 SF $t25,000.' 'Dishroom equipment: Add $13,000 NET *'Dishroom equipment: Add $18.OO0 NET