Minutes - Monday 4 June 2018Regular Meeting - Beverly City Council, Beverly, MA
MINUTES - Monday, 4 June 2018 @ 7:00 PM
Beverly City Hall, 191 Cabot Street, 3r Floor Council Chamber
Called to Order @ 7:05 PM
Roll Call: Timothy P. Flaherty, Julie R. Flowers, John P. Frates Jr. -Vice President,
Scott D. Houseman, David J. Lang (absent), James F. Latter, Donald G. Martin, Estelle
M. Rand, Paul M. Guanci- President.
Pledge of Allegiance to the Flag: Councilor Martin, Dean
Moment of Silence: None
Presentations, Awards and Memorials:
1. LATE FILE - #132 —Public Art —Councilor Houseman, Dr. Steven Immerman
Resolutions: None
Comments by Citizens (subject to the conditions contained in Appendix
A to the "Rules and Orders "): Anyone who would like to speak at the
Meeting has until 9:30AM on the day of the Meeting to register with the
City Clerk. (Limit of 3 @ 5 minutes each): None
Public Hearings:
1 #114 - 7:30 PM — Petition — National Grid — Plan #25528088, Bay View AV
Public Hearing held & closed — Referred back to Public Services
Acceptance of Minutes of Previous Meetings:
1. Monday, 21 May 2018 - Regular Meeting
2. Tuesday, 29 May 2018 — Special Meeting
Vote to Annrove: 8 -0
Communications from His Honor the Mayor:
#121
June 4, 2018
The Honorable City Council
City Hall
Beverly, MA 01915
93
Dear Honorable City Council:
I am pleased to inform you that the City of Beverly has been awarded a $300,000 grant from the
Land and Water Conservation Fund (LWCF) Grant Program from the Baker - Polito
Administration. This grant funding will be used to upgrade and improve Pete's Park in honor of
Pete Frates who inspired the Ice Bucket Challenge to strike out ALS and continues to
demonstrate incredible courage and strength.
With your approval, this grant will be used to renovate and make significant improvements to
Pete's Park and to provide access for all Beverly residents to enjoy. The project will include
overlook space, an accessible play structure and swing set area, basketball court, repaired and
resurfaced tennis court and seating area, and a nature - inspired play space and outdoor classroom.
Massachusetts General Law Chapter 44 Section 53Arequires both council and mayoral approval
before any grant or gifts to the city can be expended for their prescribed purpose. I therefore
request the council approve this grant by taking action on this matter at your upcoming meeting
of the City Council on June 4, 2018. Thank you.
Sincerely yours,
Michael P. Cahill
Mayor
cc: Catherine Barrett
Referred to Finance & Property
#122
June 4, 2018
The Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable City Council:
I am pleased to inform you that the City of Beverly has been awarded a $30,000 Planning for
Housing Production grant from the MassHousing grant program. MassHousing awarded 15
municipalities Planning for Housing Production Technical Assistance Grants. This funding will
be used to conduct analyses that will help the City better understand the relationship between
housing production and public services and communicate that to constituents.
On May 14 at the Massachusetts State House, the City of Beverly was selected for the inaugural
cohort of Housing Choice Communities in Massachusetts, part of the Baker - Polito
Administration's Housing Choice Initiative. 67 Housing Choice Communities will be able to
take advantage of new financial resources, including exclusive access to new Housing Choice
Capital Grants, and preferential treatment for many state grant and capital funding programs,
including MassWorks, Complete Streets, MassDOT capital projects, and PARC and LAND
grants.
With your approval, this grant funding will aid Beverly in achieving its affordable housing goals
and delivering the long term goal of new mixed - income housing in a manner that is consistent
with local priorities. Massachusetts General Law Chapter 44 Section 53A requires both city
council and mayoral approval before any grant or gifts to the city can be expended for their
prescribed purpose. I therefore request the city council approve this grant by taking action on
this matter at your upcoming meeting on June 4, 2018. Thank you.
11
Sincerely yours,
Michael P. Cahill
Mayor
cc: Catherine Barrett
Referred to Finance & Property
#123
June 4, 2018
The Honorable City Council
191 Cabot Street
Beverly, MA 01915
Dear Honorable City Council:
I hereby reappoint, subject to your review and recommendation, Mr. David Dines, 5 Pilgrim
Heights, Beverly to serve as a member of the Conservation Commission.
His term is to be effective until June 30, 2021.
Sincerely yours,
Michael P. Cahill
Mayor
Referred to Legal Affairs
#124
June 4, 2018
The Honorable City Council
191 Cabot Street
Beverly, MA 01915
Dear Honorable City Council:
I hereby reappoint, subject to your review and recommendation, Mr. Joseph Sciola, 22 Federal
Street, #309, Beverly to serve as the tenant representative on the Beverly Housing Authority.
His term is to be effective until June 28, 2023.
Sincerely yours,
Michael P. Cahill
Mayor
Referred to Public Services
95
#125
June 4, 2018
The Honorable City Council
191 Cabot Street
Beverly, MA 01915
Dear Honorable City Council:
I hereby reappoint, subject to your review and recommendation, Ms. Claire Marie Hart, 5
Cornell Road, Beverly to serve on the Council on Aging.
Her term is to be effective until June 30, 2021.
Sincerely yours,
Michael P. Cahill
Mayor
Referred to Public Services
#126
June 4, 2018
The Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable City Council:
As we approach the end of fiscal year 2018, it is necessary to realign some funds within our
operating budget to properly account for costs through June 30' As you are aware, any inter-
departmental transfers require approval of the City Council, and I ask for you to consider the
attached transfer requests at the next scheduled city council meeting. The major area this
transfer is seeking to address is shortfalls in the Snow and Ice budget which were a result of the
winter storms. The accompanying worksheet shows the requested transfers. This request will
require a public hearing prior to any action by the City Council. Proper advertisement of a
minimum of 7 days prior to the public hearing will be necessary. Please initiate action regarding
this request at your upcoming City Council meeting.
Sincerely yours,
Michael P Cahill
Mayor
Attachment
Referred to Finance & Property to Set a Public Hearing
Council President entertained a Motion to Accept 3 LATE FILES from
His Honor the Mayor— Approved -Vote: 8 -0
LATE FILE - #058A
June 4, 2018
The Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable City Council:
I respectfully request that you approve a $1.2M loan authorization for the purchase of parking
equipment for the downtown area. As you may recall a favorable vote was taken this past April
for this loan order however due to unmet advertising requirements we are requesting this
authorization be redone to meet the legal requirements of a City loan order.
I have attached to this request the specific language of the loan order. The full text of the loan
order must be published at least 7 days prior to the scheduled public hearing and at least 10 days
prior to final city council action on the order. The order must be referred to the Committee on
Finance and Property for a report thereon, and where the order authorizes the issuance of bonds,
it will require a two - thirds vote of all of the members of the City Council. Please take action to
set a public hearing for this request at your City Council meeting this evening.
Thank you.
Sincerely yours,
Michael P Cahill
Mayor
ORDERED: That the City appropriates the sum of One Million Two Hundred Thousand Dollars
($1,200,000) to pay costs of purchasing parking meter kiosks and related traffic enforcement
equipment, including the payment of all other costs incidental and related thereto, and to meet
said appropriation the Treasurer, with the approval of the Mayor, is authorized to borrow said
sum under M.G.L. c. 44, $7(1) or any other enabling authority and that the Mayor is authorized to
take any other action necessary to carry out this project. Any premium received by the City upon
the sale of any bonds or notes approved by this order, less any such premium applied to the
payment of the costs of issuance of such bonds or notes, may be applied to the payment of costs
approved by this order in accordance with M.G.L . c. 44, $20, thereby reducing the amount
authorized to be borrowed to pay such costs by a like amount.
Referred to Finance & Property to Set a Public Hearing
LATE FILE - #110A
June 4, 2018
The Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable City Council:
I respectfully request that you approve a $1.OM loan authorization for improvements and
modifications to the Pershing Avenue pump station. The debt service for this borrowing will be
repaid through the City's water enterprise fund. You may recall a favorable vote was taken this
97
past Fall for this loan order however due to unmet advertising requirements we are requesting
this authorization be redone to meet the legal requirements of a City loan order.
I have attached to this request the specific language of the loan order. The full text of the loan
order must be published at least 7 days prior to the scheduled public hearing and at least 10 days
prior to final city council action on the order. The order must be referred to the Committee on
Finance and Property for a report thereon, and where the order authorizes the issuance of bonds,
it will require a two - thirds vote of all of the members of the City Council. Please take action to
set a public hearing for this request at your City Council meeting this evening.
Thank you.
Sincerely yours,
Michael P Cahill
Mayor
ORDERED: That the City appropriates the sum of One Million Dollars ($1,000,000) to pay
costs of designing and constructing improvements to the Pershing Avenue Water Pumping
Station, and for the payment of all other costs incidental and related thereto, and to meet said
appropriation the Treasurer, with the approval of the Mayor, is authorized to borrow said sum
under M.G.L. Chapter 44, Section 8(4) or any other enabling authority and that the Mayor is
authorized to take any other action necessary to carry out this project. Any premium received by
the City upon the sale of any bonds or notes approved by this vote, less any such premium
applied to the payment of the costs of issuance of such bonds or notes, may be applied to the
payment of costs approved by this vote in accordance with Chapter 44, Section 20 of the
General Laws, thereby reducing the amount authorized to be borrowed to pay such costs by a
like amount.
Referred to Finance & Property to Set a Public Hearing
LATE FILE - #111A
June 4, 2018
The Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable City Council:
I respectfully request that you approve a $2.8M loan authorization for the upgrading, repair and
maintenance of the Brimbal Avenue standpipe. The debt service for this borrowing will be
repaid through the City's water enterprise fund. You may recall a favorable vote was taken this
past Fall for this loan order however due to unmet advertising requirements we are requesting
this authorization be redone to meet the legal requirements of a City loan order.
I have attached to this request the specific language of the loan order. The full text of the loan
order must be published at least 7 days prior to the scheduled public hearing and at least 10 days
prior to final city council action on the order. The order must be referred to the Committee on
Finance and Property for a report thereon, and where the order authorizes the issuance of bonds,
it will require a two - thirds vote of all of the members of the City Council. Please take action to
set a public hearing for this request at your City Council meeting this evening.
Thank you.
.•
Sincerely yours,
Michael P Cahill
Mayor
ORDERED: That the City appropriates the sum of Two Million Eight Hundred Thousand
Dollars ($2,800,000) to pay costs of repairing and repainting the Brimbal Avenue Standpipe, and
for the payment of all other costs incidental and related thereto, and to meet said appropriation
the Treasurer, with the approval of the Mayor, is authorized to borrow said sum under M.G.L.
Chapter 44, Section 8(4) or any other enabling authority and that the Mayor is authorized to take
any other action necessary to carry out this project. Any premium received by the City upon the
sale of any bonds or notes approved by this vote, less any such premium applied to the payment
of the costs of issuance of such bonds or notes, may be applied to the payment of costs approved
by this vote in accordance with Chapter 44, Section 20 of the General Laws, thereby reducing the
amount authorized to be borrowed to pay such costs by a like amount.
Referred to Finance & Property to Set a Public Hearing
Communications from other City Officers & Boards:
#110
Communication — Council President — Motion to Reconsider ( #2017 -503)
Approved on the Floor — Vote: 8 -0
Received and Placed on File — Vote: 8 -0
#111
Communication — Council President — Motion to Reconsider ( #2017 -504)
Approved on the Floor — Vote: 8 -0
Received and Placed on File — Vote: 8 -0
#127
Communication — City clerk — Permits — 2018 -2019 Sandwich Board Signs
Referred to Legal Affairs
#128
Communication — Planning Director — Ch. 270 — Parking — Effective Date Change to 1
October 2018
Referred to Legal Affairs
#129
01
Communication — City Treasurer — Quarterly Treasury Report — EOQ -3/31 /2018
Received and Placed on File — Vote: 8 -0
Council President entertained a Motion to Accept a LATE FILE from the
Councilor Houseman — Approved - Vote: 8 -0
LATE FILE - #120A
Communication — Councilor Houseman, Chair, Finance & Property — FY2019 Budget
(Set a Public Hearing)
Referred to Legal Affairs
Council President entertained a Motion to Accept another LATE FILE
from the Councilor Houseman —Approved - Vote: 8 -0
LATE FILE - #132
Communication — Councilor Houseman — Public Art Policy
Referred to Public Services and the Cultural Council
Communications, Applications & Petitions:
#130
Invitation — Ryal Side Civic Association — Parade — 4th of July
Received and Placed on File — Vote: 8 -0
Council President entertained a Motion to Accept another LATE FILE
from the Lorraine Sacco, Reid's Ride — Approved - Vote: 8 -0
LATE FILE - #131
Communication — Lorraine Sacco — Reid's ride — Sunday, 15 July 2018
Received and Placed on File — Vote: 8 -0
Motions and Orders (Second Reading):
#0676
The Committee on Legal Affairs, to whom was referred the matter of Communication — Planning Director —
Amended Ordinance — Ch. 300 — Solar Energy Systems, have considered said matter and beg leave to
report as follows, to wit:
Submit the accompanying Order and recommend its adoption:
100
ORDERED: Be it ordained by the City Council of the City of Beverly as follows:
In the year two thousand and eighteen
An Ordinance amending an Ordinance relative to Ch. 300 — "Zoning — Solar
Energy Systems ":
PROPOSED ZONING AMENDMENT
March 29, 2018
The Beverly Planning Department hereby submits a proposed amendment to the Beverly Zoning
Ordinance Chapter 300, Article II — Definitions and Article V — General Provisions, and submits
a proposed new article to the Beverly Zoning Ordinance Chapter 300.
The following amendments are proposed:
Section 300 -5 [Definitions]
Add the following new definitions to Section 300 -5.
Snlar Access
The access of a solar energy ystem to direct sunlight
Solar Energy System
A device or structural design feature, a substantial purpose of which is to provide daylight
for interior lighting or provide for the collection, storage, and distribution of solar energy
for space heating and cooling, electricity generation, or water heating.
A. Solar EnergySystem, Ground - Mounted
A solar energy ystem — including, but not limited to, panels, electrical equipment,
and accessory structures — that is structurally mounted to the ground and is not
roof - mounted, may be of any size,
B. Solar EnergySystem, Large -Scale
A solar energy ystem that occupies more than 1,000 square feet of surface area.
C. Solar EnergySystem, Roof - Mounted
A solar energy ystem that is structurally mounted to the roof of a building or
structure, may be of any size.
D. Solar EnergySystem, Small -Scale
A solar energy ystem that occupies 1,000 square feet or less of surface area.
Amend the following sections by adding "Large - Scale, Ground - Mounted Solar Energy System
subject to provisions of Section 300 -135" in the following sections:
• Section 300 -30: (R -90 — One - Family District), Section C (Uses by Special Permit)
allowed as granted by the Planning Board.
• Section 300 -31: (R -45 — One - Family District), Section C (Uses by Special Permit)
allowed as granted by the Planning Board.
• Section 300 -32: (R -22 — One - Family District), Section C (Uses by Special Permit)
allowed as granted by the Planning Board
• Section 300 -33: (R -15 — One - Family District), Section C (Uses by Special Permit)
allowed as granted by the Planning Board
101
• Section 300 -34: (R -10 — One - Family District), Section C (Uses by Special Permit)
allowed as granted by the Planning Board
• Section 300 -35: (R -6 — One - Family and Two - Family District), Section C (Uses by
Special Permit) allowed as granted by the Planning Board
• Section 300 -36: (RMD — Multi- Family District), Section C(2) (Uses by Special Permit
granted by the Planning Board).
• Section 300 -37: (RHD — Multi- Family District), Section C(2) (Uses by Special Permit
granted by the Planning Board).
• Section 300 -38: (RSD — Special Residential District), Section C (Uses by Special Permit)
allowed as granted by the Planning Board
• Section 300 -39: (CN — Neighborhood Commercial District), Section C(2) (Uses by
Special Permit granted by the Planning Board).
• Section 300 -40: (CC — Central Business District), Section C(l) (Uses by Special Permit
granted by the Planning Board).
• Section 300 -41: (CG — General Commercial District), Section B (Uses by right),
including the following language:
o Large- Scale, Ground - Mounted Solar Energy ystem subject to provisions of Section
300 -135, provided the use is accessory to another use permitted within the district.
• Section 300 -41: (CG — General Commercial District), Section C (Uses by Special Permit)
allowed as granted by the Planning Board
• Section 300 -42: (IR and IR Overlay — Restricted Industrial, Research and Office District),
Section B (Uses by right), including the following language:
o Large- Scale, Ground - Mounted Solar Energy ystem subject to provisions of Section
300 -135, provided the use is accessory to another use permitted within the district.
• Section 300 -42: (IR and IR Overlay — Restricted Industrial, Research and Office District),
Section C (Uses by Special Permit) allowed as granted by the Planning Board
• Section 300 -43: (IG — General Industrial District), Section B (Uses by right), including
the following language:
o Large- Scale, Ground - Mounted Solar Energy ystem subject to provisions of Section
300 -135, provided the use is accessory to another use permitted within the district.
• Section 300 -43: (IG — General Industrial District), Section C(2) (Uses by Special Permit
granted by the Planning Board).
• Section 300 -44: (HD — Hospital District), Section B (Uses by right), including the
following language:
o Large- Scale, Ground - Mounted Solar Energy ystem subject to provisions of Section
300 -135, provided the use is accessory to another use permitted within the district.
• Section 300 -44: (HD — Hospital District), Section C (Uses by Special Permit) allowed as
granted by the Planning Board
• Section 300 -45: (BHD — Beverly Harbor District), Section C (Uses by Special Permit),
including the following language:
o Large- Scale, Ground - Mounted Solar Energy System, the special permit is
granted by the Planning Board.
• Section 300 -46: (WDR —Waterfront Development Residential District), Section C(l)
(Uses by Special Permit granted by the Planning Board).
Section 300 -20 [Solar Access]
Amend Section 300 -20 Solar Access.
102
Reserved.
. r . .
.:eetie:reTE .
.
" t
IMIN 1
1 0_1 -
111 1
WTU
(2) Has an area not greater- than 1 ,� of the heated floor- area of the stfttetur-e sef:v
- - - - -�r-
D. A statefnei4 that a salar- eaefgy ealle I i I is installed E)a the lat shall be filed a
r-eear-ded with the City Gler-k, aifid the d4e of the installation shall be the date of -,
Chapter 300 [Zoning]
Add new Article XVIII Solar Energy Systems.
Add new Section 300 -135. Large -Scale Ground - Mounted Solar Energy Systems
A. Purbose. The burbose of this ordinance is to encourage the resbonsible develobment of
large -scale ground- mounted solar energysystems. These regulations shall include, but not be
limited to, standards for placement, design, construction, operation, monitoring,
modification, and removal of such installations that address public safety, minimize impacts
on scenic, natural, and historic resources, support the goal of reducing carbon emissions,
protect residential properties and neighborhoods, and provide adequate financial assurance
for the eventual decommissioning of installations if necessary.
B. Applicability. This section applies to large- scale, ground- mounted solar energysystems,
including associated equipment and structures. This section shall also pertain to physical
modifications that materially alter the type, configuration, or size of ground- mounted solar
energy ystems or related equipment.
(1) Large- scale, ground- mounted solar energy ystems shall require a Site Plan Review in
accordance with the Zoning Ordinance of the City_ of Beverly in addition to meeting the
requirements of this section. Use restrictions for large- scale, ground- mounted solar
en ergy ystems are established in Article VII District Regulations.
(2) The Planning Board shall be the granting authority for any Special Permit for a large -
scale, ground- mounted solar energysystem. In addition to the design performance
standards set forth in § 300- 135(H), systems requiring a Special Permit shall comply with
§ 300 -91 Special Permit Uses.
C. General Requirements.
(1) The construction of all large- scale, ground- mounted solar energy ystems shall be
consistent with all applicable local, state, and federal requirements, including but not
limited to all applicable safety, construction, electrical, and communications
requirements.
(2) Prior to the issuance of a building permit for the construction of a large- scale, ground -
103
D. A statefnei4 that a salar- eaefgy ealle I i I is installed E)a the lat shall be filed a
r-eear-ded with the City Gler-k, aifid the d4e of the installation shall be the date of -,
Chapter 300 [Zoning]
Add new Article XVIII Solar Energy Systems.
Add new Section 300 -135. Large -Scale Ground - Mounted Solar Energy Systems
A. Purbose. The burbose of this ordinance is to encourage the resbonsible develobment of
large -scale ground- mounted solar energysystems. These regulations shall include, but not be
limited to, standards for placement, design, construction, operation, monitoring,
modification, and removal of such installations that address public safety, minimize impacts
on scenic, natural, and historic resources, support the goal of reducing carbon emissions,
protect residential properties and neighborhoods, and provide adequate financial assurance
for the eventual decommissioning of installations if necessary.
B. Applicability. This section applies to large- scale, ground- mounted solar energysystems,
including associated equipment and structures. This section shall also pertain to physical
modifications that materially alter the type, configuration, or size of ground- mounted solar
energy ystems or related equipment.
(1) Large- scale, ground- mounted solar energy ystems shall require a Site Plan Review in
accordance with the Zoning Ordinance of the City_ of Beverly in addition to meeting the
requirements of this section. Use restrictions for large- scale, ground- mounted solar
en ergy ystems are established in Article VII District Regulations.
(2) The Planning Board shall be the granting authority for any Special Permit for a large -
scale, ground- mounted solar energysystem. In addition to the design performance
standards set forth in § 300- 135(H), systems requiring a Special Permit shall comply with
§ 300 -91 Special Permit Uses.
C. General Requirements.
(1) The construction of all large- scale, ground- mounted solar energy ystems shall be
consistent with all applicable local, state, and federal requirements, including but not
limited to all applicable safety, construction, electrical, and communications
requirements.
(2) Prior to the issuance of a building permit for the construction of a large- scale, ground -
103
mounted solar energysystem, an Emergency Response Plan shall be provided to the
Beverly Fire Department, along with emergency contact information. No building permit
shall be issued before the Fire Chief has approved the emergency response plan. During
and after construction, keys to all gate locks shall be provided to the Beverly
Department.
(3) Prior to the issuance of a building permit, a complete copy of the Stormwater
Management Report and Checklist shall be provided to the Planning Department, the
Municipal Inspections/Building Department, the Planning Board, the Conservation
Commission, and emergency services.
(a) The Report shall include the names, addresses, and contact information, including 24-
hour emergency contact information for all construction- period project operators
including the project owner and all project contractors and /or subcontractors.
Changes and updates to the site operator contact information must be provided in
writing to the Municipal Inspections /Building Department within one business day of
any changes /updates.
(4) Prior to the issuance of a building permit, the applicant shall provide the Municipal
Inspections/Building Department with documentation that the utility pan
operates the electrical grid where the large- scale, ground- mounted solar energy ystem is
to be located is informed of the intent of the applicant to install an interconnected
customer -owned generator. Off -grid systems shall be exempt from this requirement.
(5) Prior to final approval by the Electrical Inspector and the Municipal Inspections/Building
Department, an Operations and Maintenance (O &M) Plan shall be submitted to the
Planning Board, the Municipal Inspections/Building Department, the Conservation
Commission, and emergency services.
(a) The Plan shall include measures for maintaining safe access to the installation,
stormwater, and vegetation controls, as well as general procedures for operational
maintenance of the installation.
(b) The Plan shall include the names, addresses, and contact information for the site
owner and site operator (if different), a description of emergency response measures
including procedures for shutting down the installation, a checklist of inspection
items, a schedule for implementing routine and emergency maintenance activities,
and a long -term pollution prevention plan consistent with the requirements of the
MassDEP Stormwater Management Standards.
(c) At such a time that the responsible party(ies) transition or change, an updated O &M
Plan shall be submitted to the Planning Board, the Municipal Inspections /Building
Department, the Conservation Commission, and emergency services within five
business days of the change.
(6) Prior to issuance of a building permit, the applicant shall submit documentation of actual
or prospective access and control of the project site sufficient to allow for construction
and operation of the proposed large- scale, ground- mounted solar energysystem. If a
lease or rental agreement is used to satisfy this requirement, said lease or rental
agreement shall be for a period of not less than ten (10) years, and shall include a clause
that expressly permits the use of the property for the construction, maintenance, and use
of a large -scale solar energy system.
(7) Emergency shut -off procedures must be clearly indicated at each ingress point to the site.
Each ingress point shall restrict access to authorized personnel only.
(8) Prior to final approval by the building inspector, all landscape areas must be complete in
accordance with the Landscape Plan.
D. Site Plan Review. All large- scale, ground- mounted solar energy ystems shall undergo Site
Plan Review by the Planning Board prior to construction, installation, or modification.
104
(1) All plans and maps shall be prepared, stamped, and signed by professional engineer
licensed to practice in the Commonwealth of Massachusetts.
(2) Required Documents.
The applicant shall provide the following documents to the Planning Department as part of the
Site Plan Review process:
(a) A site plan showing:
Property lines and physical features, including roads, for the project site,
ii. Proposed changes to the landscape of the site, including rg ading, vegetation
clearing and planting, exterior lighting, screening vegetation or structures, and
new structures, including their height,
iii. Blueprints or drawings of the large- scale, ground- mounted solar energy
system signed by professional engineer licensed to practice in the
Commonwealth of Massachusetts showing the proposed layout of the system
and any potential shading from nearby structures,
iv. One- or three -line electrical diagram detailing the large- scale, ground -
mounted solar energysystem, associated components, and electrical
interconnection methods, with all National Electrical Code compliant
disconnects and overcurrent devices:
v. Documentation of the major system components to be used, including the PV
panels, mounting system, and inverter, and environmental containment of oils
if greater than fifty(50) gallons used in equipment,
vi. Name, address, and contact information for the proposed system installer,
vii. Name, address, telephone number, and signature of the property owners, the
applicant, the developer, and an other that produced material to support
the Special Permit application or site plan,
viii. Name, contact information, and signature of any agents representing the
owner or applicant,
ix. Provision of water including what is needed for fire protection,
x. Locations of local or national historic districts,
xi. List of any hazardous materials proposed to be located on the site in excess
of household quantities and a plan to prevent their release into the
environment,
xii. Locations of permanently protected open space, priority habitat areas, and a
BioMap 2 Critical Natural Landscape Core Habitat mapped by the Natural
Heritage & Endangered Species Program (NHESP) and "habitat of potential
regional or statewide importance" also known as "important habitat" mapped
by the DEP: and
xiii. Documentation of how all system components shall be secured to the ground
in a manner that ensures their stability in severe weather conditions.
(b) Proof of liability insurance:
(c) Documentation of actual or prospective access and control of the project site,
(d) Operations and Maintenance Plan,
105
(e) Emergency Response Plan,
(f) Stormwater Management Report and Checklist,
(g) Description of financial surety that satisfies Section L3;
(h) Zoning district designation and the zoning overlay(s) for the parcel(s) of land
comprising the project site,
(i) Evidence of utility notification as described in Section E5, and
0) Landscape Plan that satisfies Section H.
E. Dimension and Height Requirements.
(1) Setbacks
(a) Large- scale, ground- mounted solar energy ystems shall be located so that the
entirety of any ystem and associated equipment falls within the setback
requirements.
(b) In districts where large- scale, ground- mounted solar energy ystems are permitted by
right, the building setback requirements of the underlying zoning shall apply.
Where lots abut residential districts. setbacks from the lot line(s) adiacent to
the residential parcel shall be 50 feet.
(c) In districts where large- scale, ground- mounted solar energy ystems require a Special
Permit, setback requirements shall be as follows:
Front yard: The front yard pth shall not be less than 75 feet.
Side yard: Each side yard shall have a depth of at least 50 feet.
iii. Rear yard: The rear yard pth shall not be less than 50 feet.
(2) Appurtenant Structures
All appurtenant structures to large- scale, ground- mounted solar energy ystems shall be subject
to the City of Beverly's Zoning Ordinance requirements concerning the bulk of structures,
setbacks, open space, parking, and building coverage requirements for the underlying zoning.
All such appurtenant structures, including, but not limited to, equipment shelters, storage
facilities, fencing, transformers, and substations, shall be architecturally compatible with each
other. Structures shall be screened from view by vegetation and /or joined or clustered to avoid
adverse visual impacts.
(3) Height of Structures
The height of any structure associated with a large- scale, ground- mounted solar energy system
shall not exceed twenty(20) feet. The height of an solar from ground level shall not
exceed twenty(20) feet.
(4) Lot Coverage
The lot coverage requirements of the underlying zoning district and any pplicable overlay
districts shall apply. However, the lot coverage shall be based upon permeability rather than use.
Only permeable surfaces on the ground will be considered lot coverage.
F. Landscape Plan and Buffering.
(1) Landscaping shall be provided and maintained in accordance with the site plan approved
by the Planning Board.
106
(2) If a property owner (or designated representative) of a lot from which the proposed
installation can be seen without obstruction requests a visual rendering of the proposed
installation from a vantage point of their choosing on said lot, the applicant shall submit
one as part of the Site Plan Review. The visual rendering must accurately reflect the
horizontal and vertical scale of the installation, accessories, and landscape screening.
(3) Landscaping shall be provided and maintained on the site to screen the solar energy
system, the accessory facilities, and appurtenant structures as set forth below. Landscape
screening shall be provided adjacent to:
(a) Abutting properties where a front, side, or rear lot line of the solar energy ystem site
adjoins (or is separated by public wad) a residential district or an existing
residential use. as follows:
Landscape screening shall consist of planting, the plantings to be of such
height and depth as is needed and as determined by the Planning Board during
Site Plan Review to adequately screen from view the solar energy system,
accessories, appurtenant structures, and light sources.
ii. Such a strip shall contain a continuous screen of planting of vertical habit in
the center of the strip not less than three (3) feet in width and six (6) feet in
height to maintain a dense screen throughout the year.
iii. At least 75% of the plantings shall consist of evergreens and shall be evenly
spaced along the length of the buffer strip.
iv. In lieu of continuous planting, a solid brick, stone, or wood fence of a design
approved by the Planning Board, or a planted earthen berm of a design
approved by the Planning Board may be established and maintained with the
plantings in an amount of no less than 20% of the amount required above.
v. Removal of healthy trees over five (5) inches in diameter at breast height
(DBH) shall be minimized in the buffer strip to the maximum extent
practicable. Any such trees as are removed shall be replaced onsite, one tree
to be replaced for each tree removed. New or replacement trees must be at
least two (2) inches DBH.
vi. All landscaped areas including, but not limited to, walls and fences shall be
properly maintained. Plantings that die shall be replaced within one growing
season by the property owner. Plantings shall be maintained in accordance
with the site plan for the duration of the presence of a solar energy ystem on
the site.
(b) When abutting public ways, in addition to landscaping in front and side yards
mentioned above, landscape screening shall consist of planting, the plantings to be of
such height and depth as is needed and determined by the Planning Board during Site
Plan Review to screen adequately from view any unshielded light source, generated
or reflected, either inside or outside.
G. Relief by pecial Permit. Relief from setback, dimension, and height requirements, and
landscape and buffering requirements, may be sought through Special Permit from the
Planning Board. The Planning Board may consolidate the review of all applications that
come under its iurisdiction into one review procedure.
(1) A Special Permit for the aforementioned relief will only be awarded if the large- scale,
ground- mounted solar energy ystem meets the following criteria:
(a) The solar energy ystem serves as a canoe for or a parking lot or serves as another
similar use, or
(b) The applicant provides a description of the solar energy ystem and the technical,
107
economic, and other reasons for the proposed location and design, to be prepared and
signed by a registered professional engineer, and
(c) Systems requiring a Special Permit shall comply with § 300 -91 Special Permit Uses.
H. Design and Performance Standards.
(1) Lighting
Outdoor lighting, including lighting on the exterior of a building or lighting in parking areas,
shall be arranged to minimize glare and light spilling over the neighboring properties. Except for
low -level intensity pedestrian lighting, all other lighting shall be designed and located so that:
(a) The luminaire (LED) has an angle of cutoff less than 76 degrees,
(b) A line drawn from the height of the luminaire (LED) along the angle of cutoff
intersects the ground at a point within the development site,
(c) The bare light bulb, lamp, or light source is completely shielded from direct view at
any point five (5) feet above the ground on neighboring properties or streets,
(d) Lighting shall be directional to preclude light pollution of neighbors or the night sky
and shall be "Dark Sky" pliant and meet International Dark Sky FSA certification
requirements,
(e) The owner /manager shall be responsible for maintenance of lighting systems.
Lighting shall not be kept on after 9:00 pm. unless there is an emergency
required for safety purposes as determined by the Beverly Fire Department.
(2) Signage
Signs on large- scale, ground- mounted solar energy ystems shall comply with the City of
Beverly Sign Ordinance and all other applicable requirements from Beverly's Code of
Ordinances. A sign shall be required to identify only the owner or manager and provide a 24-
hour emergency contact phone number.
(3) Utility Connections
Reasonable efforts shall be made to place all utility connections from large- scale, ground -
mounted solar energy ystems underground, depending on appropriate soil conditions, shape, and
topography of the site, as well as any requirements of the utility provider. Electrical transformers
for utility interconnections may be above ground if required by the utility provider.
(4) Roads
Access roads shall be constructed to minimize grading, removal of stone walls or trees, and
minimize impacts of environmental or historic resources. All access roads must be approved by
the Beverly Fire Department.
(5) Hazardous Materials
Hazardous materials stored, used, or generated on site shall not exceed the amount for a Very
Small Quantity Generator of Hazardous Waste as defined by the DEP pursuant to MassDEP
regulations 310 CMR 30.000, and shall meet all requirements of the DEP, including storage of
hazardous materials in a building with an impervious floor that is not adjacent to any floor drains
to prevent discharge to the outdoor environment. If any hazardous materials, including, but not
limited to, lithium ion (storage batteries) are used within the solar electric equipment, then
impervious containment areas capable of controlling and containing any release of hazardous
materials to the environment and to prevent potential contamination of groundwater are required.
A list of any hazardous materials proposed to be located on the site and a plan to prevent their
release shall be provided to the Planning Board and Fire Department. The use of cadmium
telluride solar panels is prohibited in the City of Beverly.
108
(6) Noise
Noise generated by large- scale, ground- mounted solar energy systems and associated equipment
and machinery shall conform at a minimum to applicable state and local noise regulations,
including the DEP's Division of Air Quality noise regulations, 310 CMR 7.10.
(7) Visual Impacts and Glare
The solar energy system, including all accessories and appurtenant structures shall be designed to
minimize visual impacts, including preserving natural vegetation to the maximum extent
possible, blending in equipment with the surroundings and adding vegetative buffers to provide
an effective visual barrier from adjacent roads and screen abutting residential properties,
regardless of development status. Siting shall be such that the view of the solar energy system
from locations off -site shall be minimal.
Reasonable efforts shall be made to design solar energy systems to prevent reflected solar
radiation or glare from becoming a public nuisance or hazard to adjacent buildings, roadways, or
properties. Such efforts may include, but not be limited to, deliberate placement and
arrangement, anti - reflective materials, solar glare modeling, and screening in addition to required
landscapes (see Section H).
I. Safety and Environmental Standards.
(1) Emergency Services
Prior to the issuance of a building permit for the construction of a large- scale, ground- mounted
solar energy system, the applicant shall provide a copy of the project summary, electrical
schematic, and site plan to the Fire Chief. The owner or manager shall cooperate with local
emergency services to develop the Emergency Response Plan. All means of shutting down the
solar energy system shall be clearly marked. A responsible person shall be identified for public
inquiries throughout the life of the installation. The identity of this person may be updated at any
time. No building permit shall be issued before the Fire Chief has approved the site plan and
Emergency Response Plan.
(2) Land Clearing and Soil Erosion
The facility shall be designed to minimize impacts to environmentally sensitive land. The
clearing of natural vegetation shall be limited to what is necessary for the construction,
operation, and maintenance of the large- scale, ground- mounted solar energy system. Top soil
will not be removed from the site. Clear cutting of forest shall not exceed five (5) acres. The
facility design shall minimize the use of concrete and other impervious materials to the
maximum extent possible.
(3) Habitat Impacts
Large- scale, ground- mounted solar energy systems shall not be located on Permanently Protected
Open Space or Priority Habitat and BioMap 2 Critical Natural Landscape Core Habitat area
mapped by the Natural Heritage and Endangered Species Program (NHESP), and shall be
designed to minimize impacts to "Habitat of Potential Regional or Statewide Importance" or
"Important Habitat" mapped by the DEP to the maximum feasible extent.
J. Monitoring, Maintenance, and Annual Reporting
(1) Solar Energy System Conditions
Solar energy systems shall be maintained in good condition. Maintenance shall include, but not
be limited to, painting, structural repairs, and maintaining the integrity of security measures. Site
access shall be maintained to a level acceptable to the Fire Chief as provided in the Emergency
Response Plan. The owner or manager of the facility shall be responsible for the cost of
maintaining the solar energy system and any access roads.
11ILS
(2) Modifications
All material modifications to a large- scale, ground- mounted solar energy ystem made after
issuance of the required building permit shall require approval by the Municipal Inspections
Department.
(3) Annual Reporting
All solar energy ystems requiring a Site Plan Review shall provide Annual Reports to the
Planning Department and the Municipal Inspections Department no later than 45 days after the
end of the calendar year. The Annual Report shall be provided by either the owner of the system
or the individual in charge of operation and maintenance, and shall include, but not be limited to,
control of vegetation, noise and light standards, and adequacy of road access. The Annual
Report shall also provide information on the maintenance completed during the course of the
year, the amount of electricity generated by the facility, and the amount of surety available for
decommissioning or indemnification (see Section U).
K. Abandonment, Decommissioning, Financial Surety, and Indemnification.
(1) Removal Requirements
Any large- scale, ground- mounted solar energy ystem which has reached the end of its useful life
or has been abandoned consistent with Section L2 of this ordinance shall be removed. The owner
or manager shall physically remove the installation no more than 150 days after the date of
discontinued operations. The owner or manager shall notify the Planning Department by
certified mail of the proposed date of discontinued operations and plans for removal.
Decommissioning shall consist of
(a) Physical removal of all large- scale, ground- mounted solar energysystems, structures,
equipment, security barriers, and appurtenant structures including, but not limited to,
equipment shelters, storage facilities, transformers, and substations, and transmission
lines from the site,
(b) Disposal of all solid and hazardous waste in accordance with local, state, and federal
waste disposal regulations.
(c) Stabilization or re- vegetation of the site as necessary to minimize erosion. The
Planning Board may allow the owner or manager to leave landscaping or designated
below -grade foundations in order to minimize erosion and disruption to vegetation.
(2) Abandonment
Absent written notice of the proposed date of decommissioning or written notice of extenuating
circumstances, the solar energy ystem shall be considered abandoned when it fails to operate for
more than one year without the written consent of the Planning Board. Upon written request
from the Municipal Inspections/Building Department, addressed to the contact address provided
and maintained by the owner and operator as required above, the owner or operator shall provide
evidence to the Municipal Inspections/Building Department demonstrating continued use of the
installation. Failure to provide such evidence within thirty(30) days of such written request shall
be conclusive evidence that the installation has been abandoned. If the owner or manager of the
solar energy ystem fails to remove the installation in accordance with the requirements of this
section within 150 days of abandonment or the proposed date of decommissioning, the City of
Beverly retains the right, after receipt of an appropriate court order, to enter and remove an
abandoned, hazardous, or decommissioned large- scale, ground- mounted solar energysystem. As
a condition of site plan or Special Permit approval, the application, system owner, and /or
landowner shall agree to allow entry to remove an abandoned or decommissioned installation.
The City's cost for the removal will be charged to the property owner.
(3) Financial Surety
Owners or managers of large- scale, ground- mounted solar energy ystems shall provide a form
of surety, either through escrow account, bond, or other form approved by the Planning Board to
110
cover the cost of removal in the event the City must remove the installation and remediate the
landscape, in an amount and form determined to be reasonable by the Planning Board, but in no
event to exceed more than 125% of the cost of removal and compliance with the additional
requirements set forth herein, as determined by the project proponent and the City. Such surety
will not be required for municipal -owned facilities. The project proponent shall submit a full
inclusive estimate of the costs associated with removal, prepared by qualified engineer. The
amount shall include a mechanism for calculating increased removal costs due to inflation. The
owner or manager shall replenish the surety as necessary to maintain an adequate amount, as
determined by the Planning Board in accordance with the requirements of this ordinance.
(4) Indemnification
The owner /manager(s) of the large- scale, ground- mounted solar energy ystem shall indemnify
and hold harmless the City of Beverly and /or any of its citizens from any and all liabilities, losses
and /or damages, including reasonable attorney fees, resulting from the failure of the
owner /operator(s) to comply with the terms of this ordinance and /or negligence in the operations
and maintenance of any structures built in accordance with it. Any provided for in this
ordinance shall be available for the aforementioned indemnification.
L. Severability. The provisions of this ordinance are severable, and invalidity section,
subdivision, subsection, paragraph, or other part of this ordinance shall not affect the validity
or effectiveness of the remainder of this ordinance. For any provision of this ordinance that
conflicts with another state or local ordinance, the most restrictive provision shall apply.
Add new Section 300 -136. Small -Scale Ground - Mounted Solar Energy Systems
A. Purpose. The purpose of this ordinance is to encourage the responsible development of
small -scale ground- mounted solar energysystems. Small- scale, ground- mounted solar
energy ystems shall be considered accessory structures to both residential and non-
residential uses.
B. Applicability. This section applies to small - scale, ground- mounted solar energysystems,
including associated equipment. Small- scale, ground- mounted solar energy ystems are
permitted by right as accessory
C. General Requirements.
(1) Small- scale, ground- mounted solar energy ystems shall be permitted anywhere in a side
or rear yard of any lot if theme
(a) Have rear yard setbacks of at least 10 feet,
(b) Conform to side yard setback requirements of the underlying zoning district for
principal uses,
(c) Are not located between a building wall and any street, and
(d) Are no taller than 10 feet in height or a height equal to' /z the distance to the nearest
lot line, to a maximum of 20 feet.
(2) Small- scale, ground- mounted solar energy ystems shall be located so that the entirety
system and associated equipment falls within the setback requirements.
(3) All small - scale, ground- mounted solar energy ystems must comply with all applicable
local, state, and federal requirements, including but not limited to all applicable safety,
construction, electrical, and communications requirements.
D. Special Permits. A Special Permit from the Planning Board shall be required for any small -
scale, ground- mounted solar energy ystem that does not meet the aforementioned
requirements. When considering a Special Permit, the Planning Board shall consider the
additional performance standards required for Large- Scale, Ground - Mounted Solar Energy
111
Systems in § 300- 135(H), as well as additional landscaped buffering to reduce visual impacts
on adjacent properties. However, approval of a Special Permit is not contingent on the strict
application of these performance standards.
(1) Systems requiring a Special Permit shall comply with § 300 -91 Special Permit Uses
E. Design and Performance Standards.
(1) Lighting, Visual Impacts, and Glare
Outdoor lighting for the purpose of illuminating small - scale, ground- mounted solar energy
systems is not permitted. The solar energysystem, including all accessories and appurtenant
structures shall be designed to minimize visual impacts, including preserving natural vegetation
to the maximum extent possible, blending in equipment with the surroundings and adding
vegetative buffers to provide an effective visual barrier from adjacent roads and screen abutting
residential properties, regardless of development status. Siting shall be such that the view of the
solar energy ystem from locations off -site shall be minimal.
Reasonable efforts shall be made to design solar energy ystems to prevent reflected solar
radiation or glare from becoming a public nuisance or hazard to adjacent buildings, roadway
properties. Such efforts may include, but not be limited to, deliberate placement and
arrangement, anti - reflective materials, solar glare modeling, and screening in addition to required
landscaping.
(2) Utility Connections
Reasonable efforts shall be made to place all utilitv connections from small -scal
mounted solar energy ystems underground, depending on appropriate soil conditions, shape, and
topography of the site, as well as any requirements of the utility provider. Electrical transformers
for utility interconnections may be above ground if required by the utility provider.
(3) Noise
Noise generated by small - scale, ground- mounted solar energy ystems and associated equipment
and machinery shall conform at a minimum to applicable state and local noise regulations,
including the DEP's Division of Air Quality noise regulations, 310 CMR 7.10.
Add new Section 300 -137. Roof - Mounted Solar Energy Systems
A. Purpose. The purpose of this ordinance is to encourage the responsible development of roof -
mounted solar energysystems. Roof - mounted solar energy ystems shall be considered
accessory structures to both residential and non - residential uses.
B. Applicability. This section applies to roof - mounted solar energysystems, including
associated equipment. Roof - mounted solar energy ystems are permitted by right in all
districts as accessory uses.
C. General Requirements.
(1) All roof - mounted solar energy ystems must comply with all applicable local, state, and
federal requirements, including but not limited to all applicable safety, construction,
electrical, and communications requirements.
(2) All roof - mounted solar energy ystems located in a local historic district shall comply
with all applicable local, state, and federal requirements, including but not limited to
Chapter 168, Article I: Historic Districts, of the Beverly Code of Ordinances, and the
Historic Districts Act, Massachusetts General Laws Chapter 40C, Section 6. This section
states that before any building located in a local historic district is constructed or altered
in a way that affects exterior architectural features, a certificate of appropriateness, a
certificate of non - applicability, or a certificate of hardship must be issued. Such
certificates shall be issued by the Beverly Historic District Commission.
112
(3) Roof - mounted solar energy ystems shall not extend more than 5 feet above the highest
point of the roof.
D. Special Permits. A Special Permit from the Planning Board shall be required for any roof-
mounted
solar energy ystem that does not meet the height requirement. Systems requiring a
Special Permit shall comply with § 300 -91 Special Permit Uses
First Reading: Tuesday, 29 May 2018
Second Reading: Monday, 4 June 2018
Pending Publication and Final Passage
Final Passage: Monday, 18 June 2018.
Order read once and adopted — Vote: 8 -0
Reports of Committees:
#058A
The Committee on Finance & Property to whom was referred the matter of Communication — Mayor— Loan
Authorization — Parking Equipment, have considered said matter and beg leave to report as follows, to wit:
Submit the accompanying Order and recommend its adoption:
ORDERED: That the City Council of the City of Beverly hold a Public Hearing on Monday, 18 June 2018
@ 7:35 PM at City Hall, 191 Cabot Street, 3rd Floor, Council Chamber, Beverly, MA relative to the
Mayor's request that the City appropriates the sum of One Million Two Hundred Thousand Dollars
($1,200,000) to pay costs of purchasing parking meter kiosks and related traffic enforcement equipment,
including the payment of all other costs incidental and related thereto, and to meet said appropriation the
Treasurer, with the approval of the Mayor, is authorized to borrow said sum under M.G.L. c. 44, $7(I) or
any other enabling authority and that the Mayor is authorized to take any other action necessary to carry
out this project. Any premium received by the City upon the sale of any bonds or notes approved by this
order, less any such premium applied to the payment of the costs of issuance of such bonds or notes,
may be applied to the payment of costs approved by this order in accordance with M.G.L . c. 44, $20,
thereby reducing the amount authorized to be borrowed to pay such costs by a like amount.
Order read once and adopted — Vote: 8 -0
#093
The Committee on Finance & Property to whom was referred the matter of Communication — Community
Preservation Committee 5 Round CPA Project Funding Recommendations, have considered said matter
and beg leave to report as follows, to wit:
Submit the accompanying Order and recommend its adoption:
City Council Votes
Community Preservation Committee 5 Round CPA Project Funding Recommendations Submitted to the City
Council April 26, 2018:
1. $59,119 — City Clerk's Office
2. $295,952 — Ward 2 Civic Association
3. $400,000 — Golf & Tennis Commission
4. $146,300 — Historic Beverly
5. $190,000 — Harborlight Community Partners
Approved: Vote 8 -0
Approved: Vote 8 -0
Approved: Vote 8 -0
Approved: Vote 8 -0
Approved: Vote 7 -0 -1 (Councilor Flowers
recused)
6. $200,000 — Cabot Housing, LLC Approved: Vote 7 -0 -1 (Councilor Flaherty
recused)
Order read once and adopted — Vote shown above for each Proiect
113
#110A
The Committee on Finance & Property to whom was referred the matter of Communication — Mayor— Loan
Authorization — Pershing Avenue Pump Station, have considered said matter and beg leave to report as
follows, to wit:
Submit the accompanying Order and recommend its adoption:
ORDERED: That the City Council of the City of Beverly hold a Public Hearing on Monday, 18 June 2018
@ 7:40 PM at City Hall, 191 Cabot Street, 3rd Floor, Council Chamber, Beverly, MA relative to the
Mayor's request That the City appropriates the sum of One Million Dollars ($1,000,000) to pay costs of
designing and constructing improvements to the Pershing Avenue Water Pumping Station, and for the
payment of all other costs incidental and related thereto, and to meet said appropriation the Treasurer,
with the approval of the Mayor, is authorized to borrow said sum under M.G.L. Chapter 44, Section 8(4) or
any other enabling authority and that the Mayor is authorized to take any other action necessary to carry
out this project. Any premium received by the City upon the sale of any bonds or notes approved by this
vote, less any such premium applied to the payment of the costs of issuance of such bonds or notes, may
be applied to the payment of costs approved by this vote in accordance with Chapter 44, Section 20 of
the General Laws, thereby reducing the amount authorized to be borrowed to pay such costs by a like
amount.
Order read once and adopted — Vote: 8 -0
#111A
The Committee on Finance & Property to whom was referred the matter of Communication — Mayor— Loan
Authorization — Brimbal Avenue Standpipe, have considered said matter and beg leave to report as follows,
to wit:
Submit the accompanying Order and recommend its adoption:
ORDERED: That the City Council of the City of Beverly hold a Public Hearing on Monday, 18 June 2018
@ 7:45 PM at City Hall, 191 Cabot Street, 3rd Floor, Council Chamber, Beverly, MA relative to the
Mayor's request that the City appropriates the sum of Two Million Eight Hundred Thousand Dollars
($2,800,000) to pay costs of repairing and repainting the Brimbal Avenue Standpipe, and for the payment
of all other costs incidental and related thereto, and to meet said appropriation the Treasurer, with the
approval of the Mayor, is authorized to borrow said sum under M.G.L. Chapter 44, Section 8(4) or any
other enabling authority and that the Mayor is authorized to take any other action necessary to carry out
this project. Any premium received by the City upon the sale of any bonds or notes approved by this vote,
less any such premium applied to the payment of the costs of issuance of such bonds or notes, may be
applied to the payment of costs approved by this vote in accordance with Chapter 44, Section 20 of the
General Laws, thereby reducing the amount authorized to be borrowed to pay such costs by a like
amount.
Order read once and adopted — Vote: 9 -0
#067
The Committee on Legal Affairs to whom was referred the matter of Communication — Planning Director —
Proposed Amendment — Solar Energy Systems (ref. #2017- 508)have considered said matter and beg leave
to report as follows, to wit:
Receive and Place on File
Order read once and adopted — Vote: 8 -0
#067A
The Committee on Legal Affairs to whom was referred the matter of Communication — Planning Board
Recommendation — Solar Energy Systems, have considered said matter and beg leave to report as follows,
to wit:
Receive and Place on File
114
Order read once and adopted — Vote: 8 -0
#120A
The Committee on Finance & Property to whom was referred the matter of Communication — Councilor
Houseman — FY19 Budget, have considered said matter and beg leave to report as follows, to wit:
Submit the accompanying Order and recommend its adoption:
ORDERED: That the City Council of the City of Beverly hold a Public Hearing on Thursday, 14 June 2018
@ 7:45 PM at City Hall, 191 Cabot Street, 3rd Floor, Council Chamber, Beverly, MA relative to the
Mayor's proposed Fiscal Year 2019 Budget.
Order read once and adopted — Vote: 8 -0
#121
The Committee on Finance & Property to whom was referred the matter of Communication — Mayor— Grant
— Land & Water Conservation Program - $300K — Pete's Park, have considered said matter and beg leave to
report as follows, to wit:
Recommend the Council Approve the Request
Order read once and adopted — Vote: 7 -0 -1 (Councilor Frates recused)
#122
The Committee on Finance & Property to whom was referred the matter of Communication — Mayor— Grant
— Mass Housing $30K — Planning for Housing Production, have considered said matter and beg leave to
report as follows, to wit:
Recommend the Council Approve the Request
Order read once and adopted — Vote: 8 -0
#126
The Committee on Finance & Property to whom was referred the matter of Communication — Mayor— Budget
Transfer Requests — EOFY18, have considered said matter and beg leave to report as follows, to wit:
Submit the accompanying Order and recommend its adoption:
ORDERED: That the City Council of the City of Beverly hold a Public Hearing on Monday, 18 June 2018
@ 7:30 PM at City Hall, 191 Cabot Street, 3rd Floor, Council Chamber, Beverly, MA relative to the
Mayor's Fiscal Year 2018 End of Year Budget Transfers.
Order read once and adopted — Vote: 8 -0
#128
The Committee on Legal Affairs to whom was referred the matter of Communication — Planning Director —
Ch. 270 "Parking and Traffic" — Effective Date Change to 1 October 2018, have considered said matter and
beg leave to report as follows, to wit:
Recommend the Council Approve the Request
Order read once and adopted — Vote: 8 -0
115
#114
The Committee on Public Services, to whom was referred the matter of Petition — National Grid — Plan
#25528088 — Bay View AV (Set a Public Hearing, have considered said matter and beg leave to report as
follows, to wit:
Recommend the Petition be Granted.
Order read once and adopted — Vote: 8 -0
Unfinished Business: None
Meeting Adjourned: 8:35 PM Attest: D. Wesley Slate, Jr.
City Clerk
116
116