May 4 2017 DRB MinutesCITY OF BEVERLY
PUBLIC MEETING MINUTES
BOARD OR COMMISSION:
SUBCOMMITTEE:
DATE:
LOCATION:
MEMBERS PRESENT:
MEMBERS ABSENT:
OTHERS:
RECORDER:
Design Review Board
Thursday, May 4, 2017
Beverly City Hall Conference Room
Sandra Cook, Ellen Flannery, William Finch, Joel
Margolis, and Allison Crosbie
Rachel Matthews, Matthew Ulrich, and Karen
Bebergal
Brett Bauer
Cook calls the meeting to order at 6:35 p.m.
Sign: TK &K Services - 719 Hale Street
The applicant is proposing a projecting sign. The dimensions of the sign are 20 inches by
32 inches and matches a previously approved sign for an adjacent tenant, Leland
Creative.
There being no further questions or comments regarding this matter:
Cook: Moves to approve the wall sign as presented. Finch seconds the
motion. The motion carries (5 -0).
Sign: Futures Behavior Therapy Center - 55 Tozer Road
The applicant is proposing a monument sign. There previously was a sign in the same
location, but this one will have vinyl lettering.
There being no further questions or comments regarding this matter:
Margolis: Moves to approve the monument sign as presented. Finch
seconds the motion. The motion carries (5 -0).
Sign: Chive Events - 30 Rantoul Street
The applicant is proposing a temporary sandwich board sign. This is a new location for
the business that is currently at 252 Rantoul Street. There are brackets on the building for
a permanent sign. It is noted that all sandwich board signs need to be approved by City
Council. Finch observes that there are a lot of words on the sign. Cook notes that it may
Design Review Board Meeting Minutes
May 4, 2017
Page I of 4
be hard to read for drivers driving by. The applicant responds that the aim is to attract the
foot traffic passing by. Margolis asks if the sandwich board sign will go when a
permanent sign is installed. The applicant responds that they may still use the sandwich
board for special event or meals they would like to host at the new location.
There being no further questions or comments regarding this matter:
Crosbie: Moves to recommend the sandwich board sign as
presented. Finch seconds the motion. The motion carries (5 -0).
Informal Site Plan Review: Barnat Development - 112 Rantoul Street Modifications
The applicant is almost ready to pull permits for the project and describes modifications
to the plan since approval. The retail square footage had been reduced, but is now back to
that originally presented. One glass door in the middle bay may be removed depending
on the number of retail units. If removed, it would be replaced with glazing. The door to
the lobby will become a double door. In the rear of the building, a portion of the pre -cast
concrete wall will be removed to allow plantings and to block access to the drive lane of
the MBTA garage. Since both lanes will be used, the applicant states that it made sense to
discourage pedestrian access. They proposed removing windows to the building along the
drive aisle and two windows removed from the side of the building on the fifth and sixth
floor. These windows ended up being in closets and there were concerns about sight lines
to the adjacent Beverly Depot project. Brick and roof deck materials have been
purchased. A roof tower will exceed the allowed height because of elevator code
requirements and will need to be reviewed by zoning. The windows for the units will not
be double hung, but will have openings at the bottom. The applicant feels they are a much
better quality. The window trim will be a dark bronze material. The applicant is still
waiting to select the brick color, which will also drive the color selection of the metal
panels. They are trying not to match or contrast the material colors of the Station 101
building. The construction office will be located at 126 Rantoul Street. Construction
fencing should go up in late May. The front entrance to the MBTA garage will be closed
for the first seven weeks, but the rear entrance to the garage will still be open. The goal is
to have a certificate of occupancy by June 2018.
Crosbie asks if it is possible to have windows along the wall facing the drive aisle to
break up this facade. The applicant responds that windows were considered at the top of
this wall, but the MBTA's lighting requirements for the drive aisle are such that harsh
light would shine directly into those windows. Cook notes that the wall space calls for a
tile mosaic or some other art work, but sees how this may be too costly. The applicant
responds that they do not want the drive aisle to be too inviting to pedestrians, but asks if
Design Review Board Meeting Minutes
May 4, 2017
Page 2 of 4
a different material might help break up the facade. The applicant states they could
consider some artwork at the front portion of the garage entrance wall.
Margolis notes that if any restaurants are located in the retail space, then garage door
openings (such as those used at A &B Burger) could be a nice feature.
Cook asks if landscaping could be used along the end of the garage entrance /exit instead
of the screen currently proposed. The applicant responds that they do not own the land
just past the garage entrance /exit and that it is used for access to an apartment in the
adjacent building, so there may not be room for any landscaping. Cook states that she is
concerned about the appearance of just a screen to the garage drive aisles. The applicant
responds that samples of the screen can be provided for review.
Crosbie and Margolis express their preference for windows on the fifth and sixth floor
remaining. They are referring to the windows that would be located in closets. Even if the
windows were false windows, they feel it is a more cohesive look. The applicant
responds that the windows can be put back into the plans, and they will use narrow
windows to match those on the other side of these floors.
Margolis asks if there are any plans to convert the apartment units to condos. He is
concerned about the displacement of residents that results from conversions of rental
units to condo units. The applicant responds that the project is designed as long -term
rentals, but she is unable to offer any formal commitment to this because it could have
implications on the financing of the project which has already been secured.
Crosbie asks if the elevator tower will be visible from the street. The applicant responds
that it is set back as much as possible and they are hoping the visual impact will be
minimal.
There being no further questions or comments regarding this matter:
Cook: Moves to recommend approval of the changes presented with the
condition that: 1) the fifth and sixth floor windows on the north side of the
building be put back, 2) artwork is included on the front end of the wall
facing the garage entrance 3) the DRB will review brick samples and
metal colors before they are selected, 4) the DRB will review a sample of
the screen or landscaping plan for the end of the garage entrance /exit, and
5) the DRB will review any changes to the retail doors or windows used.
Finch seconds the motion. The motion carries (5 -0).
Design Review Board Meeting Minutes
May 4, 2017
Page 3 of 4
Sign: Beverly Crossing - 116 Rantoul Street
The applicant is proposing a projecting sign and is trying to match the existing signage
for the building. Crosbie expresses concern about the sign of the size. A special permit is
required for projecting signs that are more than seven square feet in area. This sign as
proposed is 46 inches by 30 inches, or 9.58 square feet. The applicant states that the sign
will be in the same location as the Aveda sign. It will be the same size as the Aveda sign
as well, but the frame for the sign is larger.
There being no further questions or comments regarding this matter:
Cook: Moves to recommend approval of projecting sign to the ZBA
under special permit, and as presented. The sign requires a special permit
because of its size. Flannery seconds the motion. The motion carries (5 -0).
March Draft Meeting Minutes
Crosbie asks if there are any questions or edits to the March and April meeting minutes.
There being no further questions or comments regarding this matter:
Crosbie: Moves to approve the March 2, 2017 minutes. Finch
seconds the motion. The motion carries (5 -0).
Flannery: Moves to approve the April 6, 2017 minutes. Crosbie
seconds the motion. The motion carries (5 -0).
Adjournment
Cook asks if there is any other business to come before the Design Review Board this
evening. There being none:
Finch: Moves to adjourn the meeting. Crosbie seconds the motion. The
motion carries (5 -0).
The meeting is adjourned at 7:55 p.m.