1987-04-23
"""
Wqe QHt~ of ~elJfrI~, cffia5S&C~lt5ett$
CONSERVATION COMMISSION
BEVERLY, MASSACHUSETTS
'nNL7TES SF "JEETING O!\ 4PRIL 23.1987
MEMBERS PRESENT: Ray Bouchard, George
Batchelder, Paula Richar"ds, Peter Gjlmo:'e.
~eeting called to order at 7:45 P.M.
Motion to recess to a Public Hearing made by Peter,
Paula R -i \~hdrd seconded_
I-\LL IN FAVOR !!
Beverly Airport #5-246 continued SITE IMPROVEMENT
Luc Carriere Engineer, made the presentation. Intent to
clear area of all trees, Te~porary seeding, etc, will be
used for erosion con~rol.
Additional information~ubmitted at Lhis time,
r,e : cIa cui at ion s .
George: Questionea a letter froru the Board of Health re: the
septic system.
Peter: Pc: Runway 34 what is the incidence of the visibility
re: loss 3f aircraft?
HOI-'l ofte:-, does this occur?
Landing Aircraft and appro~ching the field?
Greg chapman: 2 in 10 that go below that visibility factor.
Peter: If no trees are allowed to be takeh down. what
happens. ~~hen?
greg: Will appeal to the fAA, there's a Grant Involved.
Joe: What other alternatives a~e there Re: the clearing of
trees.
Greg: Went to FAA;
-to raise tower 225,000
-to move tower 1,000,000
-to remove trees 8,000
Peter: 13 years ago the trees were there, alsothe tower was
there. Why wasn't ~his brought up before now?
Greg:Disagrees, the trees have grown much more, Poplar Trees
GENERAL PUBLIC
,Judy WeF! :er
11 Lakeview Ave.
Wood ch~ps WIll be left after
trees have been cut down. Feels chips would prevent
re-vegetation.
All information s~bmitted found to be satisfactorily.
HEARI~G CLOSEO
t:>
..,
I
~ot # it Longfellow Subdivision Wadsworth place
Representatives Beals ahd Thomas Engineers, made the
presentation. Environmentalist, ~argaret Prevot.
No work proposed in the buffer zone to the lot.
Kosian: 90 feet (approximately)
Peter: Grade of road, higher than grade of lot Re:
drainage.
George: re; A large gully, large bank of silt, the,water
runs over a strip of the rip rap, then dlsperses. Up above,
it should be filled in (Robin will look at it.).
[nforMation is sufficient, therefore,.
t.f/~
HEARING CLOSED
John W. War'ner of Standley St. Lot B Single Family HomE:
#5-252
Paul Summer Core Envirunmental Engineer Co. made the
Presentation.
A brook does run through the lot.
Joe: Distance from edge of structure to wetlands?
Summer : 15 feet.
Joe: .4fte:r- hole is dug, only 8' vJil1 be left, what about Hay
Bales?
George: Questioned concerns re:water (ground)
Summer: Yes, ground water is high in the ares.
Engineer Peter Gabboi stated no cellar, will be a wall Copen
wall ).
Paul SUffiffier: Will flag the trees as a barrier, so the
wetlands will be protected from construction.
Ray said to Paul Summer: To sUDmit a letter statin~ that no
ce_llar ,,;ill f:xist, also fir.ished floor elevation plan.
Peter: CJuestioned the driveway re: runoff.
"
HEARING CLOSED
RECO!'iVENE
ORDERS OF CONDITI0~S:
I
#5-249 Longfellow Place Lot ~5
Motion made by Joe,
Peter seconded,
To add to Standards-Hay bales and a siltation barrier
to be included on all future Order~ of Conditions,
ALL IN F!\VOR ,~
-
(3 )
'f/A-
J
#5-251 Longfellow Place Lot # 23
Motion made by Joe,
Paula seconded.
ALL IN FA,VOR !!
#5-248 Charles Raymond 54 South Terrace
Standards Plus (on file) additionals,
Motion made by PeLer,
doe seconded.
ALL In FAVOR
#5-247 Wesley H. Eaton 5 Curtis Point
Stan(lar"cs plus additinnaJs.
Motion made by Peter,
Paula seconded.
ALL Ii-J FAVOR !'
:1:5-121
1 Year
Motjon
George.
ALL ! i'J
connolly 152 Conant
perwit extension.
made by Peter.
secoi1ded.
Ft\VOR ..
St.
#5-250 Longfellow Place Lot ~11 Wadsworth Place
Motion to approve made by Joe,
Paula Se(~:ooded.
ALL Pi Fl\VOR .'
Discussi0n of Leonhard's Greenhouse.
MoLion Dade by George,
Joe seconded.
To continu0 driv~way main~enance. will stabiiize the
existil'g drive\>ia~/ to make it pas5ab}t~.
4LL I\] F l\ VOR "
Motion to adjourn at 9:20 P.M. made by Peter,
Paula seconded.
ALL Pi PAVOR '1'1'
Mar~e S. Cotreau/clerk