2000-03-06Regular Meeting of Beverly City Council Mar. 60 2000
Roll Call: All Councilors were present.
Pledge of Allegiance to the Flag: ledby Councilor Guanci
Appointments:
Acceptance of Minutes of Previous Meeting:
Meeting of February 7, 2000 as amended
Communications from His Honor the Mayor:
March 6, 2000
Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable Council:
The attached Capital Expenditure Plan builds on those from previous years and contains many
projects currently thought to be desirable for improvement of the quality of life in Beverly or
projects which will insure the uninterrupted availability of essential services to our City. It is
important to note that projects contained herein will be brought forward individually for
specific approval and appropriation. Your general review and acceptance of this plan would
authorize no projects and commit no funds.
As you know, the Capital Expenditure Plan is ambitious. You will see the impact of a new
school project each year and the impact of drainage improvements, dump capping and public
safety facilities, etc. We believe that the City will fortunately be able to afford this plan based
on extensive new industrial growth in the pipeline including Cummings with the partial TIF
expiration on July 1, 2001, developntent near the airport, (Aero Manufacturing, Eaton, etc.),
but full pursuit of the plan will impact our options elsewhere. Please pay particular attention
to the bottom line on page 31 enti~ed Debt Service Required which shows an increase of over
$3,000,000 between year 2001 and year 2003 in the annual payment for debt service.
It is important that the Council and the community realize that tradenffs are likely between
operating expenses and capital projects. This perspective will be especially helpful for you to
have in the Spring when operating budgets are created.
I suggest that the Council schedule an entire evening for review of this plan after you have had
an opportunity to first review its contents.
Very truly yours,
William F. ScanIon, Jr., Mayor
CASH & DEBT SERVICE REQUIREMENTS AND
FUNDING SOURCES
Pages 23-32
II. SUMMARY AND HIGHLIGHTS -
The Capital Expenditure Plan includes a strong emphasis on the means to make Beverly clean and
safe while markedly improving our in~'astructore and our quality of life.
Major attention continues to be placed on making our school facilities second to none within the
Commonwealth with a school under renovation and enlargement each year until the process is
complete. By the time this process is complete we will have invested in excess of $100,000,000 in
our school facilities. A dedicated and determined program exists to solve storm water drainage
problems throughout the entire City.
Equipment to insure the best in fire response and that needed to keep our City clean year round as
well as clear in the event of snowstorms is a high priority as is a focus on improved water service to
thousands of Beverly residents.
Actions to provide sufficient active recreational spaca for all Beverly residents are planned, as is the
acquisition of additional passive (open) space. Also included is a plan to improve many sweets and
sidewalks and a new interchange at Route 128.
The plan is extensive and expensive but contains no liills. As the cover le~aer points out the ~mds
needed for debt service grow significantly because of decisions already taken and others soon to be
taken. It is only because of remarkable new growth in our near term that the plan is viable.
Nonetheless the Capital Plan has relevance to the capacity to grow expenditures in other budget
sections.
III. Year In Review
Progress against the Capital Expenditure Plan was significant in the past year.
highlights follow:
Some of the
The long-standing problem of the dump cupping was solved. Today the demands of the State
Department of Environmental Protection have been met at a cost of over $5 million. This 30-acre site
which the State had demanded be capped some fourteen years ago in 1986 is finally complete. We
can now begin to examine ways in which we may utilize this site for the benefit of the community.
The Airport Connector Road, known as Sam Fonzo Drive, was completed. One new industrial
building along this roadway is nearly finished. Another is in the planning process and the land
necessary for construction has been acquired. Utilities have been put in place. The Airport is fully on
City sewer eliminating a serious septic system issue. Various parcels of land near the Airport are or
soon will be available for sale or long-term lease leading to increased City revenues. Many homes
near the Airport now have access to sanitary sewer service and have much improved water service.
Construction to solve age-old drainage problems is in progress. The City Council appropriated
$9,000,000 for those improvements. The Chase Street project is proceeding well and will be
completed this calendar year. The Lawrence Brook Project is significantly designed and construction
will begin in the Spring of 2000 on a major portion of the project. Much work has been done on the
Chubbs Brook design and the Environmental Impact Report has been started.
Design of a joint public safety facility is underway. The Ayers School has been very successfully
renovated. The Hannah School is under renovation now.
Henderson Road Area Investigation -
During the period of this plan, we intend to do everything possible to make Beverly clean, beautiful
and. safe. This intention translates into increased investment in Fire and Public Services Department
eqmpment.
The Fire Department requires a 1250-gallon per minute pumper at a cost of $280,000. The budget
includes a sidewalk sweeper at $75,000 which will be used in conjunction with the regular street
sweeper eneh Tuesday and Thursday morning between 2:00 a.m. and 5:00 a.m. in the downtown.
With this equipment we will be able to ensure that our downtown streets and sidewalks are clear and
clean, a condition absolutely essential to reach Beverly's potential as the Garden City. Naturally the
equipment will also be used throughout the rest of the City.
Also included are three four-wheel drive trucks with plows and a truck-sized snow blower attachment
which will permit snow to be picked up and moved as necessary. Other year one items include a van
and chipper truck, a replacement ~'ent-end loader and a dedicated water/sewer backhoe and ten-wheel
dump truck.
During the period of the plan, a replacement street sweeper is budgeted, as is another fire engine, a
vacuum and flusher truck plus a bucket loader and a backhoe.
Drainage -
Unlike most projects in this plan, fitads in the amount of $9,000,000 were previously appropriated for
drainage. The first major project (Chase Street) is significantly underway and will be completed this
year. Lawrence Brook will see significant constxuction activity during calendar 2000. Chubbs Brook
is still undergoing design and does require an Environmental Impact Report. Progress in this arena
has been good.
Other DrainaRe Problems -
These include Ward 5 along Brimbal Avenue, Ward 5 in the Willow Pond urea, issues near the Dane
StreeqLothrop Street intersection and other locations. Funds for studies of these issues have been
increased to allow the City to make good on its promise to solve all possible storm water drainage
issues which adversely impact residents by flooding cellars, etc. Estimated funds needed to correct
these issues are also included.
VI. Dump Risk Assessment - See also discussion of Dump
Cap above.
With the completion of the damp capping, consideration will be given to a Risk Assessment. The
timing needs additional discussion but early estimates for a thorough review involve a four-month
period of analysis at a enst of $100,000. The Risk Assessment will help predict when the dump
surface can safely be used fur active recreation. The dump cap has been seeded and greenery should
appear in the Spring. The Risk Assessment has been budgeted for FY 2001.
VII. Hannah and Cove Schools -
The Hannah School is in progress while the Cove School contract has been let. The cost numbers
used herein are from the actual enntracts awarded. The Hannah School is expected to be completed
in the summer of 2000. Students will return to Hannah from their one-year stint at McKay in
September 2000. Cove students will move to McKay for the 2000-2001 school year while it
undergoes renovation and expansion.
~1111
decrease traffic delays, provide convenience to many Beverly residents, and improve the value of
nearby land currently zoned industrially thus ultimately improving the City's cash flow.
No additional development will be created by the project beyond what is already allowed under
current zoning but properties will be more valuable.
While the bulk of the cost will be borne by the State, we believe that significant private contributions
(well in excess of $1,000,000) will be
available. These should improve the likelihood of State funding in the near to medium term. As
currently envisaged this project contains no City funds.
There is hope that Norwood Pond can be dredged using a combination of public end private funds.
The project is not yet sufficiently developed to provide useful cost information and none is included
but a significant offer of private funds has been intimated.
Public Safety Design and BuiM -
In 1999 the City Council approved some $600,000 for the design of a joint public safety facility on
land at Cummings Center on which the City holds a purchase option. At this time the design is
progressing.
The assumption contained in this plan is that slightly less than 50,000 square feet will be required to
satisfy the needs of both the police and fire departments. The architect tells us that 12-15%
constructiun cost savings can be assumed for a joint facility vs. two stand-alone facilities (in addition
to land cost savings).
We are at this time carrying an estimate of $10,500,000 to be expended from this time forward to
complete this project including an estimated $8 million in construction costs. More detailed
information will follow soon.
We anticipate consummation of the option on the land late this Spring followed by construction later
this year. We would hope to complete and occupy the facility by the summer of 2002.
VentIon -
There is considerable consensus that the City should acquire this 3.7-acre waterfront site so as to be
able to exert some control over its development. Morton Thiokol, parent of Ventron, has confirmed
in writing its willingness to sell the property for $925,000. The Capital Expenditure Plan assumes
two years of ownership on an interest only basis prior to the site becoming a productive asset. Morton
is looking for acquisition to occur by end calendar 2000. We will naturally need to be very certain
that the site is totally environmentally acceptable prior to acquisition. Morton Thiokol, now part of
Rohm and Haas is preparing information confirming that all environmental issues have been solved
and is further preparing a draft letter oflntent regarding the purchase.
Hurd Stadium Stands -
The stands at Hurd Stadium are aluminum benches on steel frames which are badly rusted and in
need of sandblasting, reinforcing, welding and painting. It is planned that the side of the field in
worse condition will be improved this year with the other side to follow two years later. This is
primarily a safety driven project. The first side needs to proceed in the Spring of the year 2000.
Small Road - Ward
The road has been designed. The desirability of the project has been reviewed with the Ward 2 Civic
Association. It has met with the Association's majority approval. Currently access and egress to this
area are very limited. The road would allow better access to the Goat Hill area by cars coming across
the bridge ~'um Salem and reduce driving through the neighborhood. Additionally the road would
allow easier egress from the area to Rantoul or Cabot Streets again reducing driving through the
neighborhood. The project requires the acquisition of land. Discussions in this regard are in progress.
The first of these will be located on Moraine Farm, courtesy of the Batchelders. That field will
require construction funds as well as an expenditure to create parking.
Significantly, three others can be located on the Vitale site, an 18.4 acre parcel located in North
Beverly at Route 97 and Henderson Road. These three fields would be a major stop toward meeting
the needs of the Recreation Commission.
The City has spent considerable sums evaluating this site from an environmental viewpoint. (See
Henderson Rood Area Investigation) Our consultants have concluded that use of the site for active
recreation is an excellent choice. Quoting from their summary:
_~Ransom is already able to and does offer its firm opinion that
given the results of our investigations performed that future development of the site for
recreational use is not only appropriate, but can move forward at this time and will not be
impacted by environmental conditions or by implementation of the final response actions
that will be completed to achieve regulatory closure. '
The Conservation Commission will be requested to shif~ the Vitale site to active recreation on a
permanent basis. The City will offer land larger in size than the Vitale site not currently under
conservation control to be added to conservation.
A portion of the Vitale site may become a skating facility with appropriate parking. The surface
drainage from the skating facility could be directed to the Bass River (as opposed to Wenham Lake) if
that is determined to be desirable. Because the City will be running a deep sanitary sewer line up
Cabot Street (Route 97) to Henderson Rood, storm drainage diversion would have minor cost impact.
(See North Beverly Phase II Water and Sewer)
Another field can be created by the reactivation and enlargement of the field behind the Briscoe
Middle School when the school is renovated and the bus storage activity is moved.
Two other fields may be possible near the North Beverly Elementary School for local neighborhood
use. Currently children living in that area have no playing fields. Another alternative is the recently
capped dumpsite although it may be bener suited to becoming a small golf course for reasons of
topography and cost.
B. Passive -
C.
In accordance with the wishes of the Open Space Committee
we will attempt to acquire the Hill/Santin properties and the
Green's Hill property.
Our success will dopend on whether we can reach agreement with prospective sellers--all parties will
need to be reasonable--and further depend on our ability to secure a self-help grant. Our State
Ropresentative, Michael Cahill, is optimistic that we will be able to succeed in obtaining a
Self-help matching grant from the State of Massachusetts. That grant will be essential to our
achieving our gool.
As discussed later in this plan, if acquisition of Green's Hill is effected, the City will build a road
from Bridge Street to the Ayers School.
Grover Street -
The first section of Grover Street to be improved from Middlebury Lane to Old Planter's Road is
response time, improve fire safety and reduce traffic tie-ups and delays. The road would be located on
the Green's Hill land which we hope to acquire,
Park Street Roofs
The Departmont of Public Services buildings at Park Street have roofs which leak badly and suffer
from structural weaknesses. Some minor work is being performed at this time. $200,000 has been
set aside for these improvements to bring these facilities into reasonable condition.
Annul Unforeseen -
Because of the presence of large numbers of expensive projects, the allowance for unforeseen has been
reduced to zero. If required, an unforeseen project will have to substitute for an identified project.
XI. Brimbal Avenue -
The section of Brimbal Avenue between Essex Street and Otis Road near Route 128 was net
completed last year and will be dane in the spring of the year 2000. The project includes rood
surfacing, sidewalks and drainage improvements.
ltilh School Boilers -
Agreement has been reached with Beverly Hospital to investigate a heating connection by trench fi'om
the Hospital Power Plant to Beverly High School to allow the school to be heated by the hospital
boilers. The project looks to be very interesting. It may even be possible to heat the Briscoe Middle
School in the same manner. Other projects have kept this project fi'om full analysis but a thorough
feasibility study will be conducted this year (year 2000).
This project would provide for an interesting benefit for the City fi'om the hospital at little cost to
either party and with significant savings. To ensure that this project gets thorough consideration at
an early date an outside consultant will be selected to study the cost feasibility and benefits.
An initial estimate of the cost to make the necessary connection between the hospital boiler room and
the High School is included.
XII. Design Renovation to Secondary Schools -
The Secondary School Facilities Committee has begun deliberations on our three secondary schools.
A decision has been made to keep the three existing sites and make major physical improvements
based on programmatic changes to each of these. The decision has also been made to improve
Briscoe first. Now the School Committee must make additional decisions as to which grades will be
located in which schools.
Prior to architects being engaged to design the renovations or a new facility, a decision will be
necessary as to Briscoe's future role. Will it be a Grade 5 and 6 middle school or a Grade 6, 7, 8
middle school or something else? These questions are before the School Committee and should be
answered this year (year 2000).
Briscoo School -
Briscoe School was in the worst physical condition of any of the buildings which we expect to
continue to be a school fur a long period. As a result, it has been chosen to be the first secondary
school site to be improved.
Expenditures of $8,000,000 are shown in each of FY 2004 and 2005 following the completion of
Cove in 2001, North Beverly in 2002 end Centervilte and 2003.
Secondary Schools Renovation -
Briscoe is expected to take two years to complete end a $16,000,000 expenditure is consistent with
current expectations but more definite estimates will be developed from the Secondary School Design
Process.
XIII. Bus Garaging Location and Maintenance Facility
In 1999 the bus garage at Briscoe School was torn down because it was falling down. Currently bus
maintenance is done at the Airport under difficult conditions. Long-term bus parking end
maintenance at the rear of the large 45-acre Hannah School site with direct access to end from
Brimbal Avenue at Rte. 128 is an interesting concept. It would allow ready access to Route 128 for
easy movement of busses but might need to be linked to the interchenge project. This subject will
require additional work.
Currently bus drivers have no easy way to access rest rooms and no lobby area in which to await
plenned trips during the day. The Hannah location, if feasible, is at least 2-3 years away.
Cemeteries
To add to our inventory of cemetery space the Batchelders have offered two parcels of land to the City
at defined prices and other parcels have been identified as of interest. If purchased, these additional
cemetery parcels would be self-supporting. In the year 2000 analysis will be completed and action
recommended.
XIV. North Beverly School -
Part of the Elementary Facilities Plen, this school was originally estimated at slightly over
$6,000,000. When the project is done in 2001 it is currently anticipated that the cost will be to be
over $9,000,000 although as discttssed below some expansion has occurred.. The State
reimbursement rates per square foot generally rise each year. Beverly is currently reimbursed at 64%
up to a defined ceiling. North Beverly will be the fifth of the Elementary Schools in the Elementary
Schools Facilities Plan to be redone. Project includes complete renovation of the existing school
building with a substential addition. Construction to begin July 1, 2001 for completion in twelve
months. Larger schools will have larger cleaning and maintenance costs to be offset with the
efficiencies created with fewer end larger schools as Edwards end McKay cease to be used as schools.
The School Superintendent has requested that this school be enlarged beyond the plans submitted to
the State by two classrooms to meet special education needs. He has made a similar request regarding
the Centerville School. Cost estimates have been adjusted to allow for this additional physical
expansion.
Centerville School -
Part of the Elementary Facilities Plen, this school was originally estimated at $5,739,000. When the
project is done in 2002 it is currently enticipated the cost will be $8,540,000 although some
expansion has been included. The State reimbursement rates per square foot generally rise each year.
Beverly is currently reimbursed at (>4% up to a defined ceiling. Sixth and final school of the
Elementary Schools in the Elementary Schools Facilities Plen to be built. Project includes complete
renovation of the existing school building with a substantial addition.
Construction to begin July 1, 2002 for completion in twelve months. Larger school will have larger
cleaning maintenence costs to be offset with the efficiencies created with fewer and larger schools as
Cummings has offered the "Y" a matching grant of up to $1,000,000 toward the construction of a
new facility.
The likely location of this facility is McPherson Drive. The existing McPherson Youth Center may
be torn down and a larger building located at that site. City participation, if any, is as yet undefined.
The entire site is very restrictive because of its small size.
Waterfront -
Recently the State of Massachusetts paid for a study of the best use of the City owned property on the
waterfront. One of the clear recommendations was that the three existing city buildings be removed
from the area or destroyed.
Discussion has gone on for many years regarding the waterfront. The one consistent moneymaker on
the waterfront is slip rental. Penpie will come from many miles (25 or more) to lease slips in Beverly.
Therefore, we must explore carefully and thoughtfully the possibility of adding to the number of
slips. With increased revenue can come improvements in our waterfront. No funds are included in
the C.E.P. at this time but active analysis of waterfront improvements is underway.
Fire House Design -
The 128 overpass/interchange project should lead to the City obtaining from the State a parcel of land
close to Rotae 128 and bordered by the Northbound Sohier Road/Brimbal Avenue exit. On this site
we intend to build a firehouse to replace the North Beverly station. It would have rapid access to
Centerville along 128 while being close to North Beverly. It would also have rapid access to the Cove
along Brimbal Avenue. The time frame has been advanced to the summer of 2002 to correspond with
the joint facility on Elliott Street.
One Time lmOrovements to SWeets and Sidewalks
For the current year the State has cut back on Chapter 90 aid. Beverly contains some 120 miles of
roads. To keep the momentum of improved streets and sidewalks going, we have developed a one-
time project calling for $500,000 to be invested in sidewalks and $1,000,000 in roads. For these sums
we would redo nearly two miles of sidewalk and overlay at least 6 miles of roadway which would
allow the improvements of the worst 5% of our total road network. This project would allow for road
and sidewalk improvements in each ward of the City.
It is not currently clear that we can afford to take on this project. Preparation of the 2001 operating
budget and end year results for the year 2000 will both be relevant to this decision. The project will
be defined and ready ifa decision to proceed is made.
Beverly Farms Liban' -
Volunteers have successfully solicited some $700,000 toward a goal of $1,500,000 which would be
matched by $1,500,000 of City funds. The $3,000,000 project is expected to begin in FY 2002 and he
completed by the following year. Complete renovation and improvement of this facility is planned.
XV. Wa~rand Sewer-
Beverly has been blessed with a very high quality and abundant supply of water. The delivery
system of water to Beverly residents has largely been dealt with on a breakdown basis only. As a
result, our systems are in need of major improvements. The planned improvements are broken
down into three categories as shown below. The total water and sewer capital budget for the five-
year period is over $21 million of which $4 million will be administered by SESD.
XVI.
with replacement of some 10,600 residential meters across the City (water meters one-inch in
diameter or less). It is expected to pay for itself by accounting for considerable water not now
billed because of broken or faulty or tampered meters.
Following a reasonable period of time after installation of the primary meters, the City will
permit installation of so called second meters for lawn and garden use. Rules regarding second
meters will be promulgated in advance of their installation being allowed.
In parallel with the residential water meter installation we will begin installation of all new
meters in businesses throughout the City (meters greater than one inch in diameter). Business
services generally utilize larger diameter pipes because of the larger volumes of water needed and
the meters are correspondingly larger.
2. Service Replacements -
It is anticipated that some 4,000 homes have water services containing galvanized steel pipe
which clog over time reducing flow and pressure dramatically. In such cases the galvanized pipe
usually runs fi'um the meter to the sidewalk - under homenwaer property - and fi'om the
sidewalk to the water main in the street - under city property.
When the installer enters a home to replace the present meter with a new, City owned meter, a
check will be made of the type of pipe serving the home and the flow characteristics will be tested
by running the water wide open for one minute.
The City will offer a program to replace the entire run of galvanized pipe from the cellar wall to
the main on the following shared basis:
At the discretion of the homeowner, the section under City property (expected to cost some
$2,000 on average) will be paid for by the City. The section under homeowner property will be
paid for by the homenwner. The City will do the entire job and charge the homenwner a standard
$1,000 charge if the cellar wall is within 20 feet of the back of sidewalk or an additional $50 per
foot of distance if the cellar wall is further than 20 feet ~'om the back of sidewalk. This work will
not be performed simultaneously with the new meter installation because it will take much
longer. Replacamont will be done with copper pipe and should guarantee a lengthy period of
good service. A program will be established to allow homeowners two years to pay off their
obligation. The budget has been constructed assuming 250 services will be improved this year
followed by 500 each of the following four years. It will be the homenwner's decision as to
whether to enter this program.
3. Main Lines and Valves -
Beverly has 162 miles of water mains beneath the surface of the ground which bring water to the
vicinity of all the homes and businesses throughout the City. Many of these mains are more than
50 years old and
some are as much as 100 years old. No regular replacements or cleaning and lining programs
have ever existed.
Recently we had to replace the line in North Beverly from Conant Street to Trask Street along
Route 97. Currently we must replace the line under Elliott Street between the Danvers line and
McKay Street. With recent school projects, McKeown, Ayers and Cove we have in each ease
encountered problems in providing an adequate water supply end had to make significant
modifications.
It is expected that over the next ten years we must replace some 25% of the mains in the City
(approximately 40 miles). This U'anslates into 4 miles of water main per year and must include
valving to be able to isolate the affected area as well as hydrants to insure adequate fire response.
To this end we have budgeted $1,500,000 each year for water main improvements.
project will be carried financially at SESD and its cost will be reflected in our assessments. The
construction cost is estimated at $4,000,000.
North Beverly - Phase II -
Phase II of the water and sewer improvements to North Beverly will see the sanitary sewer line
extended along Cabot from Trask to Henderson and see the water service in the same area improved
by installation of a larger line. This project will benefit from a significant grant obtained with the
help of Congressman Tierney.
The design includes, if a decision to do so is made, a storm water runoff line to be included in the
same trench containing the sanitary sewer line and running ~'om Henderson Road along Cabot Street
to Trask Street to capture runoff from the roof and the parking lot of a skating facility, an 8-10 acre
site. Because the tronch would be open anyway, the cost of installing this line is expected to be
modest. While traps and filters would be employed in the skating facility parking lot, thus giving
comfort that the storm drainage was not harmful, the drain line to the Bass River versus Wenhem
Lake would give additional comfort and onsure absolutely no threat to our water supply. Informal
feedback from the Beverly Salem Water Supply Board is highly positive.
NOTE: The reader may be confused by having heard statements which related to draining some 50
acres near the airport toward the Bass River at a significant cost. In the instant case the drainage
would be limited to that of the skating facility.
Cross Lane/Bovles Street -
Engineering to design sanitary sewer services for Cross Lane and Boyles Street is in progress.
Construction should be complete by the end of calendar 2001.
REFERRED TO FINANCE AND PROPERTY
#76
March 6, 2000
Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable Council:
I hereby appoint, subject to your review and recommendation, the following to serve as members of
the Commission on Disabilities:
Mr. Norman Ganley
10 Stone Street
Term to be effective until November 1, 2002
Mr. Robert Nelson
5 Hopkins Avonue
Term to be effective until November 1, 2002
Very truly youn,
William F. ScanIon, Jr., Mayor
REFERRED TO PUBLIC SERVICE AND AID
Communications from other City Officers and Boards
Enclosed herewith please find the proposed Harbor Regulations for the 2000
boating season. I have reviewed them and discussed them with the Harbormaster.
I ask you approve them per city of Beverly Revised Ordinances Sex. 2-274.
Sincerely Yours,
Marshall J. Handly, City Solicitor
Referred to Leqal Affairs and Accounts
Communications, Applications and Petitions
#78
Communication relative to problem at 7 Lakeshore Drive regarding problems left
after water break
Referred to Public Service and Aid
://:79
Application Class II MVDL George's Citgo
Referred to Leaal Affairs and Accounts
#80
Request trom Joint Public Safety Facility Advisory Committee to speak at meeting
Receive and Place on File
#81
Communication from Mass Dept of Revenue Div. Of Local Services Senior Citizen
Property Tax Work-off Abatement
Refer to Finance and Property
#82
Comm from Mass Dept of Revenue Div of LocaJ Services Summary of 1999 Municipal
Finance Law Changes
Referred to Finance and Property
#83
Comm from Charles Sherrill re Order $43 Proposed proviso to be incorporated in the
definition of "family"
Receive and Place on File
Referred to Public Service and Aid
#86
Comm from State Human Resources Division re Eugene H. Rooney, Jr. Public Service
Award
Receive and Place on File
#87
North Shore Regional Vocational School District Annual Report-Short Form
Referred to Finance and Property
#88
North Shore Regional Vocational School District Annual Report
Referred to Finance and Property
#89 Late File
Communication from Planning Department relative to Beverly Shuttle Bus Service
Contract
Referred to Leaal Affairs and Accounts
#90
Claim-Michael Maguire
Receive and Place on File
Refer to City Solicitor
Reports from Committees:
#26
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Roadway and Utility Easements Winthrops Grant have considered said matter and
beg leave to report as follows, to wit:
Submit the accompanying order and recommend its adoption
ORDERED: That the City Council accept the attached roadway and utility
easements for the Winthrop's Grant subdivision on the city's behalf.
Order read once and Adopted 9-0 Vote
Order Read once and Adopted 9-0 VOTE
://:64
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Retirement Board request to accept MGL have considered said matter and beg
Jeave to report as follows, to wit:
Submit the accompanying order and recommend its adoption
Ordered: That the City Accept Section 51 of Chapter 127 of the Acts of 1999
which adds to General Laws c 32 103 (I), and allows the City council
approval of an additional cost of living adjustment in excess of the 1.3
percentage increase allowed. In future years the retirement board may elect
to grant a cost of living increase to its retirees at a maximum of 3% without
the City Councirs approval, however the council must receive a 30 day notice
in advance of a publicly posted meeting by the retirement board.
Order Read once and Adopted 9-0 VOTE
#67
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Application for Class III Motor Vehicle License J & P Used Auto Parts have
considered said matter and beg leave to report as follows, to wit:
Recommend the License Be Granted
Order read once and adopted 9-0 Vote
#68
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Application Lima License Logan Express, Inc. have considered said matter and beg
leave to report as follows, to wit:
Recommend the License Be Granted
Order read once and adopted 9-0 Vote
#73
The Committee on Legal Affairs and Accounts to whom was referred the matter of
retaining consultant for engineering services for development of Dallas Property off
Essex St. have considered said matter and beg leave to report as follows, to wit:
Refer to Planning Department
Order read once and adopted 9-0 Vote
Regular Meeting of Beverly City Council Mar. 6, 2000
Roll Call: All Councilors were present.
Pledge of Allegiance to the Flag: ledby Councilor Guanci
Appointments:
Acceptance of Minutes of Previous Meeting:
Meeting of February 7, 2000 as amended
Communications from His Honor the Mayor:
#75
March 6, 2000
Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable Council:
The attached Capital Expenditure Plan builds on those from previous years and contains many
projects currently thought to be desirable for improvement of the quality of life in Beverly or
projects which will insure the uninterrupted availability of essential services to our City. It is
important to note that projects contained herein will be brought forward individually for
specific approval and appropriation. Your general review and acceptance of this plan would
authorize no projects and commit no funds.
As you know, the Capital Expenditure Plan is ambitious. You will see the impact of a new
school project each year and the impact of drainage improvements, dump capping and public
safety facilities, etc. We believe that the City will fortunately be able to afford this plan based
on extensive new industrial growth in the pipeline including Cummings with the partial TIF
expiration on July 1, 2001, development near the airport, (Aero Manufacturing, Eaton, etc.),
but full pursuit of the plan will impact our options elsewhere. Please pay particular attention
to the bottom line on page 31 entitled Debt Service Required which shows an increase of over
$3,000,000 between year 2001 and year 2003 in the annual payment for debt service.
It is important that the Council and the community realize that tradeoffs are likely between
operating expenses end capital projects. This perspective will be especially helpful for you to
have in the Spring when operating budgets are created.
I suggest that the Council schedule an entire evening for review of this plan after you have had
an opportunity to first review its contents.
Very truly yours,
William F. ScanIon, Jr., Mayor
1. TABLE OF CONTENTS
SUIV~IARY AND HIGHLIGHTS
THE YEAR IN REVIEW
PROJECT EXPENDITURES BY FISCAL YEAR
General Fund
Water and Sewer Funds
CAPITAL PROJECTS DESCRIPTIONS
Page 1
Page 2
Pages3--4
Page 5
Pages 6-22
43
CASH & DEBT SERVICE REQUIREMENTS AND
FUNDING SOURCES
Pages 23-32
II, SUMMARY AND HIGHLIGHTS -
The Capital Expenditure Plan includes a strong emphasis on the means to make Beverly clean and
safe while markedly improving our infrastructure and our quality of life.
Major attention continues to be placed on making our school facilities second to none within the
Commonwealth with a school under ranovation and enlargement each year until the process is
complete. By the time this process is complete we will have invested in excess of $100,000,000 in
our sehonl facilities. A dedicated and determined program exists to solve storm water drainage
problems throughout the entire City.
Equipment to insure the best in fire response and that needed to keep our City clean year roand as
well as clear in the event of snowstorms is a high priority as is a focus on improved water service to
thousands of Beverly residents.
Actions to provide sufficient active recreational space for all Beverly residents are planned, as is the
acquisition of additional passive (open) space. Also included is a plan to improve many streets and
sidewalks and a new interchange at Route 128.
The plan is extensive and expensive but contains no frills. As the cover letter points out the funds
needed for debt service grow significantly because of decisions already taken and others soon to be
taken. It is only because of remarkable new growth in our near term that the plan is viable.
Nonetheless the Capital Plan has relevance to the capacity to grow expenditures in other budget
sections.
III. Year In Review
Progress against the Capital Expenditure Plan was significant in the past year.
highlights follow:
Some of the
The long-standing problem of the dump capping was solved. Today the demands of the State
Department of Environmental Protectiun have been met at a cost of over $5 million. This 30-acre site
which the State had demanded be capped some fourteen years ago in 1986 is finally complete. We
can now begin to examine ways in which we may utilize this site for the benefit of the community.
The Airport Connector Road, known as Sere Fonzo Drive, was completed. One new industrial
building along this roadway is nearly finished. Another is in the planning process and the land
necessary for construction has been acquired. Utilities have been put in place. The Airport is fully on
City sewer eliminating a serious septic system issue. Various parcels of land near the Airport are or
soon will be available for sale or long-term lease leading to increased City revenues. Many homes
near the Airport now have access to sanitary sewer service and have much improved water service.
Construction to solve age-old drainage problems is in progress. The City Council appropriated
$9,000,000 for those improvements. The Chase Street project is proceeding well and will be
completed this calendar year. The Lawrence Brook Project is significantly designed and construction
will begin in the Spring of 2000 on a major portion of the project. Much work has been done on the
Chubbs Brook design and the Environmental Impact Report has been started.
Design of a joint public safety facility is underway. The Ayers School has been very suceassfally
renovated. The Hannah School is under renovation now.
Henderson Road Area Inves~tation -
This item was included in last year's plan. In fact the City has expended significant sums to
investigate three sites along Henderson Road regarding which environmental questions existed. The
City has managed to conduct these investigations without bending for the work by expensing same on
a current basis which is far preferable from the viewpoint of fiscal conservatism. The environmental
issues identified are not alarming but will be entirely resolved in this the year 2000. This maiter will
be concluded without capital expenditure.
IV. Departmental Equipment-
44
During the period of this plan, we intend to do everything possible to make Beverly clean, beautiful
and safe. This intention translates into increased investment in Fire and Public Services Department
equipment.
The Fire Department requires a 1250-gallon per minute pumper at a cost of $280,000. The budget
includes a sidewalk sweeper at $75,000 which will be used in conjunction with the regular sn'eet
sweeper each Tuesday and Thursday morning between 2:00 a.m. and 5:00 a.m. in the downtown.
With this equipment we will be able to ensure that our downtown streets and sidewalks are clear and
clean, a condition absolutely essential to reach Beverly's potential as the Garden City. Naturally the
equipment will also be used throughout the rest of the City.
Also included are three four-wheel drive trucks with plows end a truck~sized snow blower attachment
which will permit snow to be picked up and moved as necessary. Other year one items include a van
and chipper tntck, a replacement ~'ont-end leader and a dedicated water/sewer backhoe end ten-wheel
dump truck.
During the period of the plan, a replacement street sweeper is budgeted, as is another fire engine, a
vacuum and flusher truck plus a bucket leader and a backhoe.
Drainage -
Unlike most projects in this plan, funds in the mount of $9,000,000 were previously appropriated for
drainage. The first major project (Chase Street) is significantly underway and will be completed this
year. Lawrence Brook will see significant cunstruetion activity during calendar 2000. Chubbs Brook
is still undergoing design and does require an Environmental Impact Report. Progress in this arena
has been good.
Other Drainage Problems -
These include Ward 5 along Brimbal Avenue, Ward 5 in the Willow Pond area, issues near the Dane
StreetJLothrep Street intersection and other locations. Funds for studies of these issues have been
increased to allow the City to make good on its promise to solve all possible storm water drainage
issues which adversely impact residents by flooding cellars, etc. Estimated funds needed to correct
these issues are also included.
Vm
VI. Dump Risk Assessment - See also discussion of Dump
Cap above.
With the completion of the dump capping, consideration will be given to a Risk Assessment. The
timing needs additional discussion but early estimates for a thorough review involve a four-month
period of analysis at a cost of $100,000. The Risk Assessment will help predict when the dump
surface can safely be used for active recreation. The dump cap has been seeded and greenery should
appear in the Spring. The Risk Assessment has been budgeted for FY 2001.
VII. Hannah and Cove Schools -
The Hannah School is in progress while the Cove School contract has been let. The cost numbers
used herein are frem the actual contracts awarded. The Hannah School is expected to be completed
in the summer of 2000. Students will return to Hannah from their one-year stint at McKay in
September 2000. Cove students will move to McKay for the 2000-2001 school year while it
undergoes renovation and expansion.
VIII.
IX. Overpass Design/Build -
This project to be located near Brimbel Avenue and Rome 128 is expected to bridge Rte. 128 near the
Burger King. While originally conceived as an overpass, thought and analysis have convinced us that
an interchange is far more appropriate than simply an overpass.
An interchange includes on and off ramps and will allow all traffic to the Music Theatre and nearby
locations to come and go without ever driving on local Beverly streets. Although more expensive
than an overpass, this quality of life project will reduce emissions and pollution, improve safety,
45
decrease traffic delays, provide convenience to many Beverly residents, and improve the value of
nearby land currently zoned industrially thus ultimately improving the City's cash flow.
No additional development will be created by the project beyond what is already allowed under
current zoning but properties will be more valuable.
While the bull of the cost will be borne by the State, we believe that significant private contributions
(well in excess of $1 ,O00,O00) will be
available. These should improve the likelihood of State funding in the near to medium term. As
currently envisaged this project contains no City funds.
There is hope that Norwood Pond can be dredged using a combination of public and private funds.
The project is not yet sufficiently developed to provide useful cost information and none is included
but a significant offer of private funds has been intimated.
Public Safety Desi~n and Build -
In 1999 the City Council approved some $600,000 for the design of a joint public safety facility on
land at Cummings Center on which the City holds a purchase option. At this time the design is
progressing.
The assumption contained in this plan is that slightly less than 50,000 square feet will be required to
satisfy the needs of beth the police and fire departments. The architect tells us that 12-15%
censtrnetion cost savings can be assumed for a joint facility vs. two stand-alone facilities (in addition
to land cost savings).
We are at this thne carrying an estimate of $10,500,000 to be expended from this time forward to
complete this project including an estimated $g million in construction costs. More detailed
information will follow soon.
We anticipate consummation of the option on the land late this Spring followed by construction later
this year. We would hope to complete and occupy the facility by the summer of 2002.
Ventton -
There is considerable consensus that the City should acquire this 3.7-acre waterfront site so as to be
able to exert some control over its development. Morton Thiokol, parent of Veatron, has confirmed
in writing its willingness to sell the property for $925,000. The Capital Expenditure Plan assumes
two years of ownership on an interest only basis prior to the site becoming a productive asset. Morton
is looking fur acquisition to occur by end calendar 2000. We will naturally need to be very certain
that the site is totally environmentally acceptable prior to acquisition. Morton Thiokol, now part of
Rohm and Haas is preparing information confirming that all environmental issues have been solved
and is further preparing a draft letter oflntent regarding the purchase.
Hurd Stadium Stands -
The stands at Hurd Stadium are aluminum benches on steel flames which are badly rusted and in
need of sandblasting, reinforcing, welding and painting. It is planned that the side of the field in
worse condition will be improved this year with the other side to follow two years later. This is
primarily a safety driven project. The first side needs to proceed in the Spring of the year 2000.
Small Road - Ward 2 -
The road has been designed. The desirability of the project has been reviewed with the Ward 2 Civic
Association. It has met with the Associatiun's majority approval. Currently access and egress to this
area are very limited. The road would allow better access to the Goat Hill area by cars coming across
the bridge ~'um Salem and reduce driving through the neighborhood. Additionally the road would
allow easier egress from the area to Rantoul or Cabot Streets again reducing driving through the
neighborhood. The project requires the acquisition offand. Discussions in this regard are in progress.
The intent is to build this road in the summer of 2000.
Annul Parks & Groanshate -
This section is devoted to discussion of land acquisition and site preparation or renovation.
It is important to note that active recreation is equally as noble and as important as passive recreation.
Active - This administration is dedicated to finding the space for seven athletic fields as determined
necessary by the Recreation Commission.
46
The first of these will be located on Moraine Farm, courtesy of the Batchelders. That field will
require construction funds as well as an expenditure to create parking.
Significantly, three others can be located on the Vitale site, an 18.4 acre parcel located in North
Beverly at Route 97 and Henderson Road. These three fields would be a major step toward meeting
the needs of the Recreation Commission.
The City has spent considerable sums evaluating this site from an environmental viewpoint. (See
Henderson Road Area Investigation) Our consultants have concluded that use of the site for active
recreation is an excellent choice. Quoting from their summary:
"Ransom is already able to and does offer its firm opinion that
given the results of our investigations performed that future development of the site for
recreational use is not only appropriate, but can move forward at this time and will not be
impacted by environmental conditions or by implementation of the final response actions
that will be completed to achieve regulatory closure."
The Conservation Commission will be requested to shift the Vitale site to active recreation on a
permanent basis. The City will offer land larger in size than the Vitale site not currently under
conservation control to be added to conservation.
A portion of the Vitale site may become a skating facility with appropriate parking. The surface
drainage from the skating facility could be directed to the Bass River (as opposed to Wenham Lake) if
that is determined to be desirable. Because the City will be running a deep sanitary sewer line up
Cabot Street (Route 97) to Henderson Road, storm drainage diversion would have minor cost impact.
(See North Beverly Phase II Water and Sewer)
Another field can be created by the reaetivation and enlargement of the field behind the Briscoe
Middle School when the school is renovated and the bus storage activity is moved.
Two other fields may be possible near the North Beverly Elementary School for local neighborhood
use. Currently children living in that area have no playing fields. Another alternative is the recently
capped dumpsite although it may be better suited to becoming a small golf course for reasons of
topography and cost.
B. Passive -
C.
In accordance with the wishes of the Open Space Committee
we will attempt to acquire the Hill/Santin properties and the
Green's Hill property.
Our success will depend on whether we can reach agreement with prospective sellers--all parties will
need to be reasonable--and further depend on our ability to secure a self-help grant. Our State
Representative, Michael Cahill, is optimistic that we will be able to succeed in obtaining a
Self-help matching grant from the State of Massachusetts. That grant will be essential to our
achieving our goal.
As discussod later in this plan, if acquisition of Green's Hill is effected, the City will build a road
from Bridge Street to the Ayers School.
Grover SWeet -
The first section of Grovar Street to be improved from Middlebury Lane to Old Planter's Road is
currently under contract and in progress. Improvements will include better sight distances, a
sidewalk along the Western side, slight widening of the road, and slight straightening of curves. The
sections to the North and South will follow in subsequent years until the entire road has been
improved.
Avers Aceoss From Bridge Sweet -
The City has a very preliminary design for a roadway from Bridge Street to the Ayers School located
near the bottom of the hill on Bridge Street which shows that a roadway is possible. This location
would keep the road from cutting the Ayers land mass in half. The cost to build the access road is
estimated at $500,000. These funds are available to us from the traffic mitigation monies paid to
Beverly by Stop & Shop. The road will improve safety for children, reduce emergency vehicle
47
response time, improve fire safety and reduce traffic tie-ups and delays. The road would be located on
the Green's Hill land which we hope to acquire.
Park Street Roofs -
The Department of Public Services buildings at Park Street have roofs which leak badly and suffer
from structural weaknesses. Some minor work is being performed at this time. $200,000 has been
set aside for these improvements to bring these facilities into reasonable condition.
Annual Unforeseen -
Because of the presence of large numbers of expensive projects, the allowance for unforeseen has been
reduced to zero. If required, an unforeseen project will have to substitute for an identified project.
XI. Brimbal Avenue -
The section of Brimhi Avenue between Essex Street and Otis Road near Route 128 was not
completed last year and will be done in the spring of the year 2000. The project includes road
surfacing, sidewalks and drainage improvements.
ltighSehodBoilers-
Agreement has been reached with Beverly Hospital to investigate a heating connection by trench fi'om
the Hospital Power Plant to Beverly High School to allow the school to be heated by the hospital
boilers. The project Ionks to be very interesting. It may even be possible to heat the Briscoe Middle
School in the same manner. Other projects have kept this project from full analysis but a thorough
feasibility study will be conducted this year (year 2000).
This project would provide for an interesting benefit for the City from the hospital at little cost to
either party and with significant savings. To ensure that this project gets thorough consideration at
an early date an outside consultant will be selected to study the cost feasibility and benefits.
An initial estimate of the cost to make the necessary connection between the hospital boiler room and
the High School is included.
XII. Design Renovation to Secondary Schools -
The Secondary School Facilities Committee has begun deliberations on our three secondary schools.
A decision has been made to keep the three existing sites and make major physical improvements
based on programmatic changes to each of these. The decision has also been made to improve
Briscoe first. Now the School Committee must make additional decisions as to which grades will be
located in which schools.
Prior to architects being engaged to design the renovations or a new facility, a decision will be
necessary as to Briscoe's future role. Will it be a Grade 5 and 6 middle school or a Grade 6, 7, 8
middle school or something else? These questions are before the School Committee and should be
answered this year (year 2000).
Briscoo School -
Briscoe School was in the worst physical condition of any of the buildings which we expect to
continue to be a school for a long period. As a result, it has been chosen to be the first secondary
school site to be improved.
In 1999 significant short-term improvements have been effected at a cost of about $800,000.
The Briseoe site has been approved for eligibility of reimbursement either with a new school or a
totally renovated existing school. The school is larger than what is needed for a new middle school
having once been a high school. There is a limit in terms of dollars of spending eligible for
reimbursement but it is a high limit in the order of $16,000,000. In order to renovate the school, two
school years of time would be required. The scheduling problems associated with the two-year period
are significant.
The Capital Expenditure Plan assumes expenditures of $3.2 million over four years commencing in
FY 2001 for architectural services for secondary schools.
48
Expenditures of $8,000,000 are shown in each of FY 2004 and 2005 following the completion of
Cove in 2001, North Beverly in 2002 and Centerville and 2003.
Seeondarv Schools Renovation -
Briscoe is expected to take two years to complete and a $16,000,000 expenditure is consistent with
currant expectations but more definite estimates will be developed from the Secondary School Design
Process.
XIII. Bus Garaging Location and Maintenance Facility
In 1999 the bus garage at Briscoe School was tom down because it was falling down. Currently bus
maintenance is done at the Airport under difficult conditions. Long-term bus parking and
maintenance at the rear of the large 45-acre Hannah School site with direct access to and ~'om
Brimhal Avenue at Rte. 128 is an interesting concept. It would allow ready access to Route 128 for
easy movement of busses but might need to be linked to the interchange project. This subject will
require additional work.
Currently bus drivers have no easy way to access rest rooms and no lobby area in which to await
planned trips during the day. The Hannah location, if feasible, is at least 2-3 years away.
Cemeteries -
To add to our inventory of cemetery space the Batchelders have offered two parcels of land to the City
at defined prices and other parcels have been identified as of interest. If purchased, these additional
cemetery parcels would be self-supporting. In the year 2000 analysis will be completed and action
recommended.
XIV. North Beverly School -
Pan of the Elementary Facilities Plan, this school was originally estimated at slightly over
$6,000,000. When the project is done in 2001 it is currently anticipated that the cost will be to be
over $9,000,000 although as discussed below some expansion has occurred.. The State
reimbursement rates per square font generally rise each year. Beverly is currently reimbursed at 64%
up to a defined ceiling. North Beverly will be the fifth of the Elementary Schools in the Elementary
Schools Facilities Plan to be redone. Project includes complete renovation of the existing school
building with a substantial addition. Construction to begin July 1, 2001 for completion in twelve
months. Larger schools will have larger cleaning and maintenance costs to be offset with the
efficiencies created with fewer and larger schools as Edwards and McKay cease to be used as schools.
The School Superintendent has requested that this school be enlarged beyond the plans submitted to
the State by two classrooms to meet special education needs. He has made a similar request regarding
the Centerville School. Cost estimates have been adjusted to allow for this additional physical
expansion.
CenterviHe School -
Pan of the Elementary Facilities Plan, this school was originally estimated at $5,739,000. When the
project is done in 2002 it is currently anticipated the cost will be $8,540,000 although some
expansion has been included. The State reimbursement rates per square font generally rise each year.
Beverly is currently reimbursed at 64% up to a defined coiling. Sixth and final school of the
Elementary Schools in the Elementary Schools Facilities Plan to be built. Project includes complete
ranovation of the existing school building with a substantial addition.
Construction to begin July 1, 2002 for completion in twelve months. Larger school will have larger
cleaning maintenance costs to be offset with the efficiencies created with fewer and larger schools as
Edward and McKay cease to be used as schools.
The School Superintendent has requested that this school be enlarged beyond the plans submitted to
the State by two classrooms to meet special education needs. He has made a similar request regarding
the North Beverly School. Cost estimates have been increased to allow for this additional physical
expansion.
YI~ICA Teen Center -
Cummings currently houses the Balch Street Teen Center of the YMCA. Cummings is anxious to
move the "Y" Teen Center elsewhere so as to utilize the Belch Street location for their purposes.
49
Cummings has offered the "Y" a matching grant of up to $1,000,000 toward the construction of a
new facility.
The likely location of this facility is McPherson Drive. The existing McPherson Youth Canter may
be torn down and a larger building located at that site. City participation, if any, is as yet undefined.
The entire site is very restrictive because of its small size,
Waterfront -
Recently the State of Massachusetts paid for a study of the best use of the City owned property on the
waterfont. One of the clear recommendations was that the three existing city buildings be removed
from the area or destroyed.
Discussion has gone on for many years regarding the waterfront. The one consistent moneymaker on
the waterfront is slip rantal. People will come fore many miles (25 or more) to lease slips in Beverly.
Therefore, we must explore carefully and thoughtfully the possibility of adding to the number of
slips. With increased revenue can come improvemeats in our waterl/'ont. No funds are included in
the C.E.P. at this time but active analysis ofwaterfont improvements is underway.
Fire House Design -
The 128 overpass/interchange project should lead to the City obtaining fom the State a parcel of land
close to Route 128 and bordered by the Northbound Sohier Road/Brimbal Avenue exit. On this site
we inland to build a firehouse to replace the North Beverly station. It would have rapid access to
Canterville along 128 while being close to North Beverly. It would also have rapid access to the Cove
along Brimbal Avanue. The time flume has been advanced to the summer of 2002 to correspond with
the joint facility on Elliott Street.
One Time lmnrovements to Streets and Sidewalks -
For the currant year the State has cut back on Chapter 90 aid. Beverly contains some 120 miles of
roads. To keep the momentum of improved streets and sidewalks going, we have developed a one-
time project calling for $500,000 to be invested in sidewalks and $1,000,000 in roads. For these sums
we would redo nearly two miles of sidewalk and overlay at least 6 miles of roadway which would
allow the improvements of the worst 5% of our total road network. This project would allow for road
and sidewalk improvemants in each ward of the City.
It is not currently clear that we can afford to take on this project. Preparation of the 2001 operating
budget and end year results for the year 2000 will beth be relevant to this decision. The project will
be defined and ready ifa decision to proceed is made.
Beverly Farms Libran -
Volunteers have successfully solicited some $700,000 toward a goal of $1,500,000 which would be
matched by $1,500,000 of City funds. The $3,000,000 project is expected to begin in FY 2002 and he
completed by the following year. Complete renovation and improvement of this facility is planned.
XV. Water and Sewer -
Beverly has been blessed with a very high quality and abundant supply of water. The delivery
system of water to Beverly residants has largely been dealt with on a breakdown basis only. As a
result, our systems are in need of major improvements. The planned improvements are broken
down into three categories as shown below. The total water and sewer capital budget for the five-
year period is over $21 million of which $4 million will be administered by SESD.
XVI.
1. Water Meter Replacement -
Ax~er considerable delay, the water meter replacement project will begin in the Spring of 2000.
Nearby communities have had difficult experiences with similar projects and we have worked
herd to avoid a similar outcome in Beverly.
Meters in buildings and homes are antiquated, in some cases broken, in others operating
ineffectively (inaccurate readings). Beverly's meter reading force was eliminated approximately
ten years ago. Readings by City personnel are currently taken only when properly changes hands
through sales.
New meters will be owned by the City. They will be remotely readable, that is there will be no
need to anter the building containing the meter to perform readings. The meter project will begin
50
with replacement of some 10,600 residential meters across the City (water meters one-inch in
diameter or less). It is expected to pay for itself by accounting for considerable water not now
billed because of broken or faulty or tampered meters.
Following a reasonable period of time at~er installation of the primary meters, the City will
permit installation of so called second meters for lawn and garden use. Rules regarding second
meters will be promulgated in advance of their installation being allowed.
in parallel with the residential water meter installation we will begin installation of all new
meters in businesses throughout the City (meters greater than one inch in diameter). Business
services generally utilize larger diameter pipes becauso of the larger volumes of water needed and
the meters are correspondingly larger.
2. Service Replacements -
It is anticipated that some 4,000 homes have water services containing galvanized steel pipe
which clog over time reducing flow and pressure dramatically. In such cases the galvanized pipe
usually runs from the meter to the sidewalk - under homeowner property - and from the
sidewalk to the water main in the styeat - under city property.
When the installer enters a home to replace the present meter with a new, City owned meter, a
check will be made of the type of pipe serving the home and the flow characteristics will be tested
by running the water wide open for one minute.
The City will offer a program to replace the entire run of galvanized pipe from the cellar wall to
the main on the following shared basis:
At the discretion of the humenwner, the section under City property (expected to cost some
$2,000 on average) will be paid for by the City. The section under homeowner property will be
paid for by the homeowner. The City will do the entire job and charge the homeowner a standard
$1,000 charge if the cellar wall is within 20 feet of the beck of sidewalk or an additional $50 per
foot of distance if the cellar wall is further than 20 feet from the back of sidewalk. This work will
net be performed simultaneously with the new meter installation because it will take much
longer. Replacement will be done with copper pipe and should guarantee a lengthy period of
good service. A program will be established to allow homeowners two years to pay off their
obligation. The budget has been constructed assuming 250 services will be improved this year
followed by 500 each of the following four years. It will be the homeowner's decision as to
whether to enter this program.
3. Main Lines and Valves -
Beverly has 162 miles of water mains beneath the surface of the ground which bring water to the
vicinity of all the homes and businesses throughout the City. Many of these mains are more than
50 years old and
some are as much as 100 years old. No regular replacements or cleaning and lining programs
have ever existed.
Recently we had to replace the line in North Beverly from Conant Street to Trask Street along
Route 97. Currently we must replace the line under Elliott Street between the Danvers line and
McKay Street. With recent school projects, McKeown, Ayers and Cove we have in each case
encountered problems in providing an adequate water supply and had to make significant
modifications.
It is expected that over the next ten years we must replace some 25% of the mains in the City
(approximately 40 miles). This translates into 4 miles of water main per year and must include
valving to be able to isolate the affected area as well as hydrants to insure adequate fire response.
To this end we have budgeted $1,500,000 each year for water main improvements.
Raymond Farms -
This project was put forward on Beverly's behalf by George Zambouras in 1995. The project would
be administered by SESD and funded though
SESD and was approved for partial SRF (State Revolving Fund) funding which allows the money to
be borrowed at "zero" interest, a highly advantageous situation.
The project calls for sanitary sewer and drainage improvements in the Raymond Farms area. The
project will allow homeowners plagued by flooding to pump these waters into a new drainage system
relieving the sanitary sewer line into which the water is currently pumped. The project will reduce
flooding concerns and add to the sanitary sewer capacity in the area. The 18-inch diameter sewer in
Balch Street will also be relined with a cured-in-plaee polypropylene liner under this contract. This
51
project will be carried financially at SESD and its cost will be reflected in our assessments. The
construction cost is estimated at $4,000,000.
North Beverly - Phase H -
Phase It of the water and sewer improvements to North Beverly will see the sanitary sewer line
extended along Cabot from Trask to Henderson and see the water service in the same area improved
by installation of a larger line. This project will benefit from a significant grant obtained with the
help of Congressman Tierney.
The design includes, if a decision to do so is made, a storm water runoff line to be included in the
same trench containing the sanitary sewer line and running fi'om Henderson Road along Cabot Street
to Trask Street to capture runoff from the roof and the parking lot of a skating facility, an 8-10 acre
site. Because the trench would be open anyway, the cost of installing this line is expected to be
modest. While traps and filters would be employed in the skating facility parking lot, thus giving
comfort that the storm drainage was not harmful, the drain line to the Bass River versus Wenham
Lake would give additional comfort and ensure absolutely no threat to our water supply. Informal
feedback from the Beverly Salem Water Supply Board is highly positive.
NOTE: The reader may be confused by having heard statements which related to draining some 50
aerea near the airport toward the Bass River at a significant cost. In the instant case the drainage
would be limited to that of the skating facility.
Cross lLane/Bovles Street -
Engineering to design sanitary sewer services for Cross Lane and Boyles Street is in progress.
Construction should be complete by the end of calendar 2001.
REFERRED TO FINANCE AND PROPERTY
#76
March 6, 2000
Honorable City Council
City Hall
Beverly, MA 01915
Dear Honorable Council:
I hereby appoint, subject to your review and recommendation, the following to serve as members of
the Commission on Disabilities:
Mr. Norman Ganley
10 Stone Street
Term to be effective until November 1, 2002
Mr. Robert Nelson
5 Hopkins Avenue
Term to be effective until November 1, 2002
V cry truly yours,
William F. ScanIon, Jr., Mayor
REFERRED TO PUBLIC SERVICE AND AID
Communications from other City Officers and Boards
#77
March 3, 2000
City Council
C/o Frances Macdonald
City Clerk
Beverly, MA 01915
Dear Honorable Council:
52
Enclosed herewith please find the proposed Harbor Regulations for the 2000
boating season. I have reviewed them and discussed them with the Harbormaster.
I ask you approve them per city of Beverly Revised Ordinances Sex. 2-274.
Sincerely Yours,
Marshall J. Handly, City Solicitor
Referred to Leaal Affairs and Accounts
Communications, Applications and Petitions
#78
Communication relative to problem at 7 Lakeshore Drive regarding problems lert
after water break
Referred to Public Service and Aid
#79
Application Class II MVDL George's Citgo
Referred to Leqal Affairs and Accounts
#80
Request from Joint Public Safety Facility Advisory Committee to speak at meeting
Receive and Place on File
#81
Communication from Mass Dept of Revenue Div. Of Local Services Senior Citizen
Properly Tax Work-off Abatement
Refer to Finance and Property
#82
Comm from Mass Dept of Revenue Div of Local Services Summary of 1999 Municipal
Finance Law Changes
Referred to Finance and ProDerty
#83
Comm from Charles Shetrill re Order $43 Proposed proviso to be incorporated in the
definition of "family"
Receive and Place on File
#84
Comm from Chades Shefrill re Order #43 Proposed Wording
Receive and Place on File
#85
Comm from Datum relative to sewer bill
53
Referred to Public Service and Aid
#86
Comm from State Human Resources Division re Eugene H. Rooney, Jr. Public Service
Award
Receive and Place on File
#87
North Shore Regional Vocational SchooJ District Annual Report-Short Form
Referred to Finance and Property
#88
North Shore Regional Vocational School District Annual Report
Referred fo Finance and Property
#89 Late File
Communication from Planning Depadment relative to Beverly Shuttle Bus Service
Contract
Referred fo Le.qal Affairs and Accounts
#90
Claim-Michael Maguire
Receive and Place on File
Refer fo City Solicitor
Reports from Committees:
#26
The Committee on Legal Affairs and Accounts to whom was referred the moffer of
Roadway and Ufilih/Easements Winthrops Grant have considered said matter and
beg leave fo repod as follows, to wit:
Submit the accompanying order and recommend its adoption
ORDERED: That the Cih/Council accept the attached roadway and utility
easements for the Winthrop's Grant subdivision on the cily's behalf,
Order read once and Adopted 9-0 Vote
#52
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Acceptance of deed to Parcel "B' Winthrops Grant have considered said matter
and beg Teave to report as follows, to wit:
Submit the accompanying order and recommend its adoption
Ordered: That the City Council amend order 99-330 to read
"...to accept the deed to parcel "B" of the winthrop's
Grant subdivision."
54
Order Read once and Adopted 9-0 VOTE
://:64
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Retirement Board request to accept MGL have considered said matter and beg
leave to report as follows, to wit:
Submit the accompanying order and recommend its adoption
Ordered: That the City Accept Section 51 of Chapter 127 of the Acts of 1999
which adds to General Laws c 32 103 (I), and allows the City council
approval of an additional cost of living adjustment in excess of the 1.3
percentage increase allowed. In future years the retirement board may elect
to grant a cost of living increase to its retirees at a maximum of 3% without
the City Councirs approval, however the council must receive a 30 day notice
in advance of a publicly posted meeting by the retirement board.
Order Read once and Adopted <2-0 VOTE
://:67
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Application for Class III Motor Vehicle License J & P Used Auto Parts have
considered said matter and beg leave to report as follows, to v~t:
Recommend the License Be Granted
Order read once and adopted 9-0 Vote
#68
The Committee on Legal Affairs and Accounts to whom was referred the matter of
Application Lima License Logan Express, Inc. have considered said matter and beg
leave to report as foJlows, to wit:
Recommend the Ucense Be Granted
Order read once and adopted 9-0 Vote
#73
The Committee on Legal Affairs and Accounts to whom was referred the matter of
retaining consultant for engineering services for development of Dallas Property off
Essex St. have considered said matter and beg leave to report as follows, to wit:
Refer to Planning Department
Order read once and adopted 9-0 Vote
#74
The Committee on Public Service and Aid to whom was referred the matter of F.
Killilea and B. Moriarty be invited to meeting on Water Meters have considered said
matter and beg leave to report as follows, to wit:
Receive and Place on File
Order read once and adopted 9-0
Unfinished Business:
55
The following ordinance was read into council minutes and held for final passage
after advertising:
#43 Ordinance Relative to Zoning
Motions and Orders:
#91
By Councilor Virginia McGlynn:
Resolution to increase recycling and to reduce waste generation in Massachusetts
Referred to Public Service and Aid
#92
By Councilor Timothy C. Smith:
Ordered: That the current situation regarding the condition of the property at 32
Roundy Street, owned by James Dooling, III, be further investigated as new
complaints by adjacent property owners have been brought forward.
Referred to Public Service and Aid
#93
By Councilor Donald Martin:
Ordered: That the Department of Public Services repair, where needed, the
sidewalks on Michael Road and Berrywood Lane.
Referred to Public Service and Aid
Meeting adjourned: 9:05 PM
Frances A. Macdonald, CMC
City Clerk