05.17.2022 BPB Minutes Final CITY OF BEVERLY
PUBLIC MEETING MINUTES
BOARD OR COMMISSION: Beverly Planning Board
DATE: May 17, 2022
LOCATION: Virtual Meeting via Google Meet
MEMBERS PRESENT: Chairperson Ellen Hutchinson, Vice-Chair Alexander
Craft, Sarah Bartley, Ellen Flannery, Derek Beckwith
MEMBERS ABSENT: Wayne Miller, Andrea Toulouse, Rodney Sinclair
OTHERS PRESENT: Planning Director Darlene Wynne, Associate Planner
Victoria Healey
RECORDER: Stacia Chamberlain
Call to Order
Chairperson Hutchinson calls the meeting to order at 7:01 p.m. and reads a prepared statement
introducing the meeting and noting the authority to hold a remote meeting.
Subdivision Approval Not Required Plans
a. none at this time
Request for Modification: OSRD #11-18 and Definitive Subdivision Plan for Thaxton
Heights—Michael McNiff
Bob Griffin of Griffin Engineering is on call to discuss the subdivision plan related to minor
building location and drainage changes to Lots 1 and 2. Lot 3 is not included. He provides
project schematics on screen and summarizes how the layouts have changed on each lot. He
invites questions from the Board. Hutchinson asks for clarification on changes to the
impervious surface and the addition of the dry well. Beckwith asks about the distance of the
new building plan to the track buffer. He asks that the Board make corrections to the typo in the
square foot totals for the proposed house.
Beckwith: Motion to deem the modification to Site Plan OSRD 9 11-18 at Thaxton
Heights as minor in nature. Flannery seconds. Hutchinson takes a roll-call
vote. The motion carries 5-0.
Beckwith: Motion to approve the modification to Site Plan OSRD#11-18 at Thaxton
Heights. Craft seconds. Hutchinson takes a roll-call vote. The motion
carries 5-0.
Request for Modification: Site Plan#141-99— 108 Bridge Street—David Cutler
Thomas Alexander, attorney for the property owner, is on call to discuss the modification
request. He summarizes the proposed changes and invites questions from Board members.
Beckwith asks about the retaining walls from George Zambouras, site engineer. Beckwith asks
about drainage from the retaining wall. Beckwith and Hutchinson ask about the location of the
retaining wall on either 108 or 106 Bridge Street. Mr. Alexander says that there was a retaining
wall at that location and they have moved its location just slightly. Hutchinson is not sure how
to authorize the building of a concrete wall that is on someone else's property. Mr. Zambouras
answers that both properties are owned by the same owners. Mr. Alexander says that because
the owner is the same for both properties, there is no issue of trespassing. Beckwith asks about
the removal of the privacy fences between the unit patios. Alexander confirms their removal.
Beverly Planning Board
May 17,2022 Meeting Minutes
Page 2 of 3
Members discuss the height of the fence atop the retaining wall.
Craft: Motion to deem the modification to Site Plan 9141-99 at 108 Bridge Street
as minor in nature.Flannery seconds. Hutchinson takes a roll-call vote.
The motion carries 5-0.
Craft: Motion to approve the modification to Site Plan#141-99 at 108 Bridge
Street. Beckwith seconds. Hutchinson takes a roll-call vote. The motion
carries 5-0.
Request for Modification: Site Plan# 124-16— 62 Dunham Road/64 Dunham Road—
Iron Tree Services c/o John Maestranzi
John Maestranzi is on call to discuss the project as the applicant and summarizes the request.
He solicits questions from the Board. Flannery would like to know how long the trailers would
be on the site. Mr. Maestranzi replies that their timeline would probably be in the vicinity of
five years and notes they are called"temporary" because of how they are installed on a site,
without foundations. Beckwith asks about parking on the site and the general layout or flow of
the site. Hutchinson is concerned that they will set a precedent and potentially allow misuse of
the minor modification statute. Beckwith asks whether they could condition an approval such
that no additional trailers would be added. Members discuss a condition based on a percentage
of the current square footage of the property.
Craft: Motion to deem the modification to Site Plan # 124-16 at 62/64 Dunham
Road as minor in nature. Craft seconds. Hutchinson takes a roll-call vote.
The motion carries 5-0.
Beckwith: Motion to approve the modification request to Site Plan # 124-16 at 62/64
Dunham Road with the condition that any additional buildings or
structures, exceeding 5,490 sq. ft. in total, representing 30% of the existing
square feet of building space, including this addition, must be brought
before the Planning Board for approval. Flannery seconds. Hutchinson
takes a roll-call vote. The motion carries 5-0.
Endorse Definitive Subdivision Plan (without Covenant) and 81X Certificate—R65 West
Street (63 West Street)—Evan Wile,West Street Realty Trust
Sander Rikleen, attorney for the applicant, and Evan Wile, owner, are present on call to discuss
the application. Rikleen summarizes the requests and the legal history of the site and subdivision
approval. He explains that a Form G Covenant or Performance Bond are not necessary because
the roadway is already constructed. Craft asks Wynne if they must rule on the Covenant
separately. Wynne answers yes. Hutchinson asks about the abeyance.
Flannery: Motion to endorse the Definitive Subdivision Plan without a Covenant or
performance bond—R65 West Street(63 West Street)—Evan Wile, West
Street Realty Trust, as presented. Beckwith seconds. Hutchinson takes a
roll-call vote. The motion carries 5-0.
Flannery: Motion to approve 81X Certificate indicating the plan has not changed
since previously approved despite the elapsed time greater than 6 months
—R65 West Street(63 West Street)—Evan Wile, West Street Realty Trust,
Beverly Planning Board
May 17,2022 Meeting Minutes
Page 3 of 3
with affirmation that the plan has not changed. Beckwith seconds.
Hutchinson takes a roll-call vote. The motion carries 5-0.
Set Public Hearings
Prior to setting public hearing, the Board took out of order the discussion of rescheduling the
June meeting. Board agreed to reschedule the meeting from Wednesday June 22, 2022 to
Tuesday June 21, 2022, because the City Council is not meeting that day, which aligns with the
Board's regular schedule.
a. Definitive Subdivision Plan—Trask Lane—Folly Hill Associates Trust
Wynne provides a status update on this project and the legal status of the appeal.
Hutchinson asks if they should hold a public hearing, which members discuss.
Beckwith: Motion to schedule a public hearing for the Definitive Subdivision Plan at
the Board's meeting on June 21, 2022 — Trask Lane—Folly Hill
Associates Trust for June 21, 2022. Craft seconds. Hutchinson takes a roll-
call vote. The motion carries 5-0.
Approval of Minutes
a. April 26,2022
The approval of minutes will be deferred until the next meeting as they were not
available to all members.
Other/New business
Craft announces that he will be resigning his post from the Planning Board due to work
commitments.
Adiournment
Craft: Motion to adjourn at 8:52 p.m. Flannery seconds. The motion carries 5-0.
The next regular meeting of the Beverly Planning Board will take place on Tuesday, June 21,
2022, and will be held virtually via Google Meet.